YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Energy Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Advanced Exergoeconomic Evaluation of Large-Scale Coal-Fired Power Plant

    Source: Journal of Energy Engineering:;2020:;Volume ( 146 ):;issue: 001
    Author:
    Ligang Wang
    ,
    Peng Fu
    ,
    Zhiping Yang
    ,
    Tzu-En Lin
    ,
    Yongping Yang
    ,
    George Tsatsaronis
    DOI: 10.1061/(ASCE)EY.1943-7897.0000633
    Publisher: ASCE
    Abstract: Conventional exergy-based analysis can only identify the location and magnitude of thermodynamic inefficiencies (exergy destruction), while an advanced analysis can further reveal their source and avoidability by splitting each inefficiency into endogenous/exogenous and avoidable/unavoidable parts and their combinations. In this paper, a framework and implementation for a comprehensive evaluation of energy systems via conventional and advanced exergoeconomic analyses are summarized and performed to a state-of-the-art pulverized-coal power plant. An easy-to-implement procedure was proposed to calculate the endogenous exergy destruction. Different from the previous analyses of such plants, the boiler subsystem of the considered plant is simulated in detail with coal combustor and a series of (radiation- or convection-dominating) heat surfaces. The exergoeconomic performances (exergy dissipation as well as the related costs) of each component and the whole system are evaluated first. Then, the splitting of all exergy destructions and costs is performed for the insights of their sources and avoidability to suggest improvement measures. The results show that large parts of the exergy destructions within most of the components are endogenous; particularly, over half of the avoidable thermodynamic inefficiencies within most of the components are endogenous with the share of the avoidable part varying significantly among different components. Most costs related to either investment or exergy destruction are endogenous, and only nearly 10% of the costs of the whole system could be avoided for such a modern power plant. Moving convection-dominating heating surfaces into the furnace and increasing air-preheating temperature are suggested for performance enhancement.
    • Download: (529.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Advanced Exergoeconomic Evaluation of Large-Scale Coal-Fired Power Plant

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265534
    Collections
    • Journal of Energy Engineering

    Show full item record

    contributor authorLigang Wang
    contributor authorPeng Fu
    contributor authorZhiping Yang
    contributor authorTzu-En Lin
    contributor authorYongping Yang
    contributor authorGeorge Tsatsaronis
    date accessioned2022-01-30T19:33:22Z
    date available2022-01-30T19:33:22Z
    date issued2020
    identifier other%28ASCE%29EY.1943-7897.0000633.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265534
    description abstractConventional exergy-based analysis can only identify the location and magnitude of thermodynamic inefficiencies (exergy destruction), while an advanced analysis can further reveal their source and avoidability by splitting each inefficiency into endogenous/exogenous and avoidable/unavoidable parts and their combinations. In this paper, a framework and implementation for a comprehensive evaluation of energy systems via conventional and advanced exergoeconomic analyses are summarized and performed to a state-of-the-art pulverized-coal power plant. An easy-to-implement procedure was proposed to calculate the endogenous exergy destruction. Different from the previous analyses of such plants, the boiler subsystem of the considered plant is simulated in detail with coal combustor and a series of (radiation- or convection-dominating) heat surfaces. The exergoeconomic performances (exergy dissipation as well as the related costs) of each component and the whole system are evaluated first. Then, the splitting of all exergy destructions and costs is performed for the insights of their sources and avoidability to suggest improvement measures. The results show that large parts of the exergy destructions within most of the components are endogenous; particularly, over half of the avoidable thermodynamic inefficiencies within most of the components are endogenous with the share of the avoidable part varying significantly among different components. Most costs related to either investment or exergy destruction are endogenous, and only nearly 10% of the costs of the whole system could be avoided for such a modern power plant. Moving convection-dominating heating surfaces into the furnace and increasing air-preheating temperature are suggested for performance enhancement.
    publisherASCE
    titleAdvanced Exergoeconomic Evaluation of Large-Scale Coal-Fired Power Plant
    typeJournal Paper
    journal volume146
    journal issue1
    journal titleJournal of Energy Engineering
    identifier doi10.1061/(ASCE)EY.1943-7897.0000633
    page04019032
    treeJournal of Energy Engineering:;2020:;Volume ( 146 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian