• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Engineering Mechanics
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Engineering Mechanics
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analytical Solutions for Deep-Buried Lined Tunnels Considering Longitudinal Discontinuous Excavation in Rheological Rock Mass

    Thumbnail
    View/Open
    %28ASCE%29EM.1943-7889.0001784.pdf (1.400Mb)
    Date
    2020
    Author
    Zhaofei Chu
    Zhijun Wu
    Quansheng Liu
    Baoguo Liu
    Metadata
    Show full item record
    Abstract
    For tunneling in a deep, soft rock mass, rock deformation and lining pressure, which are time-dependent behaviors, are mainly affected by rock rheology and longitudinal excavation processes. In practice, tunneling operations are often suspended due to various reasons, which will result in changes to the time-dependent behaviors of tunnel systems. To investigate the discontinuous advancement of the tunnel face in a soft rheological rock mass, in this study, closed-form analytical solutions are presented to analyze the time dependency of deep-buried circular lined tunnels. In the derivation, four types of viscoelastic models are utilized to consider the different creep behaviors of the host rock. The coupling effect between rock rheology and tunnel face advancement is also taken into account. To realistically simulate the process of tunnel face advancement, five different excavation methods are considered in the solutions that depend on whether the face stops and on the changes of advancing speeds before and after stoppage. The proposed solutions are validated by comparing the calculated results with those predicted by a finite difference simulation. According to the provided solutions, a series of parametric analyses are systematically performed to investigate the influences of the lining installation time, the duration of the tunnel face stoppage, the tunnel face advancing parameters, and the rheological parameters of the rock on rock stresses and displacement, as well as the support pressure. Finally, the proposed solutions are successfully applied to the Rong Jiawan tunnel when an excavation stoppage occurs halfway before tunnel completion, and the theoretical predictions are in good agreement with the field monitoring data. The solutions proposed in this paper provide an efficient analytical approach for predicting and analyzing the discontinuous excavation of rheological tunnels.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265510
    Collections
    • Journal of Engineering Mechanics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV