• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Rehabilitation of Longitudinal Joints in Double-Tee Girder Bridges

    Thumbnail
    View/Open
    %28ASCE%29BE.1943-5592.0001412.pdf (5.160Mb)
    Date
    2019
    Author
    Mostafa Tazarv;Lucas Bohn;Nadim Wehbe
    Metadata
    Show full item record
    Abstract
    Precast prestressed double-tee girder bridges are common on county bridges in South Dakota. However, the longitudinal joints of these bridges are rapidly deteriorating, causing girder replacement after only 45 years of service. The present study was conducted to develop, construct, and evaluate rehabilitation methods for the longitudinal joint of double-tee bridges. Twenty joint rehabilitation detailing alternatives are proposed and ranked in the present study. Thirteen large-scale beams were tested to investigate the performance of the best four rehabilitation details. Ultrahigh-performance concrete (UHPC) and latex modified concrete (LMC) were selected as the filler materials. Subsequently, two joint concepts, “pocket” and “continuous,” were developed based on the experimental and analytical studies. A full-scale 12.19-m (40-ft) long double-tee girder bridge was constructed using conventional longitudinal joint detailing and was tested under fatigue loads. Subsequently, the bridge was rehabilitated using the two proposed details and was tested under fatigue and strength loading. No significant damage, beyond initial shrinkage cracks in LMC, was observed throughout the fatigue testing. Furthermore, the stiffness of the bridge did not degrade. No significant damage or yielding of the reinforcement in the rehabilitated joints was observed throughout the strength testing. Overall, the rehabilitated bridge met all current code requirements indicating sufficient structural performance. The rehabilitation cost of a double-tee bridge with pocket detailing is expected to be less than 30% of the bridge superstructure replacement cost.
    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4257319
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV