Evaluation of Stormwater Infrastructure Design Storms Developed Using Partial Duration and Annual Maximum Series Models
Date
2018Author
Vrban Sandra;Wang Yi;McBean Edward A.;Binns Andrew;Gharabaghi Bahram
Metadata
Show full item recordAbstract
This study assesses the advantages and limitations of developing design storms using the partial duration series exceedance-based (PDS-E) rainfall frequency model in comparison with the annual maximum series (AMS) model. Rainfall records were obtained from 21 rainfall gauges in Ontario. A procedure to develop the PDS-E was derived, addressing sensitivities to missing values, selection of thresholds, and quantile and confidence limit estimates. The reference values of 1-h duration and 2- and 5-year return period design rainfall intensities were 1% and 3% greater in PDS-E than in AMS data, on average, indicating the merits of using PDS-E data for exceedance-based modeling of frequent events. The PDS-E estimates of 1-h duration and 5-year return period events were 3.5% greater than AMS estimates. The use of the PDS-E method over the AMS method for developing design storms for stormwater infrastructure is recommended.