Show simple item record

dc.contributor.authorYang, Jia
dc.contributor.authorZhang, Rongyong
dc.date.accessioned2017-11-25T07:18:48Z
dc.date.available2017-11-25T07:18:48Z
dc.date.copyright2016/20/12
dc.date.issued2017
dc.identifier.issn2332-8983
dc.identifier.otherners_3_1_014501.pdf
dc.identifier.urihttp://138.201.223.254:8080/yetl1/handle/yetl/4235420
dc.description.abstractThis article conducts optimization and sensitivity analysis for the cold-end system of a nuclear power plant (NPP) with a sea water circulating system, using the minimum annual cost method by dynamic economical analysis. The following factors are taken into account for the optimization: the design of a condenser (cooling area and the parameters of cooling tubes), the scale of the cooling tower, the flow rate of circulation water, and the diameter of circulating pipes. In conclusion, the optimum scheme of the cold-end system is obtained for the double-back pressure turbine project. The variation trend of the annual cost with changing circulating water amount is also concluded. Finally, this article provides the sensitivity analysis of the feed-in tariff.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleOptimization for Steam Turbine Cold-End System of a Nuclear Power Plant and Sensitivity Analysis
dc.typeJournal Paper
dc.journal.volume3
dc.journal.issue1
dc.journal.titleJournal of Nuclear Engineering and Radiation Science
dc.identifier.doi10.1115/1.4035285
dc.journal.fristpage14501
dc.journal.lastpage014501-4
dc.treeJournal of Nuclear Engineering and Radiation Science:;2017:;volume( 003 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record