dc.description.abstractWhen hopper dredges are used in fast‐moving waters relatively far from a dredged‐material disposal site, dredging managers must decide whether to dispose of the material by either hauling the material to a disposal site or resus‐pending the material. Hauling the material to a disposal site decreases the time available for dredging and consequently increases the total time required to dredge a given volume. Disposal of the dredged material by resuspension increases the time available for dredging at the site, but may increase the amount of dredging required downstream. This paper examines the trade‐off between these two strategies using a simple time‐and‐motion model.
dc.publisherAmerican Society of Civil Engineers
dc.titleThe Decision to Haul versus Resuspend for Hopper Dredging
dc.typeJournal Paper
dc.journal.volume117
dc.journal.issue6
dc.journal.titleJournal of Waterway, Port, Coastal, and Ocean Engineering
dc.identifier.doi10.1061/(ASCE)0733-950X(1991)117:6(599)
dc.treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;1991:;Volume ( 117 ):;issue: 006
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record