• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Waterway, Port, Coastal, and Ocean Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Waterway, Port, Coastal, and Ocean Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The Decision to Haul versus Resuspend for Hopper Dredging

    Thumbnail
    View/Open
    %28asce%290733-950x%281991%29117%3A6%28599%29.pdf (647.4Kb)
    Date
    1991
    Author
    Jay R. Lund
    Metadata
    Show full item record
    Abstract
    When hopper dredges are used in fast‐moving waters relatively far from a dredged‐material disposal site, dredging managers must decide whether to dispose of the material by either hauling the material to a disposal site or resus‐pending the material. Hauling the material to a disposal site decreases the time available for dredging and consequently increases the total time required to dredge a given volume. Disposal of the dredged material by resuspension increases the time available for dredging at the site, but may increase the amount of dredging required downstream. This paper examines the trade‐off between these two strategies using a simple time‐and‐motion model.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/40906
    Collections
    • Journal of Waterway, Port, Coastal, and Ocean Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV