Show simple item record

dc.contributor.authorTan Dan Do
dc.contributor.authorAbdel-Hakim Bouzid
dc.contributor.authorThien-My Dao
dc.date.accessioned2017-05-09T00:46:36Z
dc.date.available2017-05-09T00:46:36Z
dc.date.copyrightAugust, 2011
dc.date.issued2011
dc.identifier.issn0094-9930
dc.identifier.otherJPVTAS-28548#041205_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/147447
dc.description.abstractBolted flange joints are part of pressure vessel and piping components and are extensively used in the chemical, petrochemical, and nuclear power industries. They are simple structures and offer the possibility of disassembly, which makes them attractive to connect pressurized equipment and piping. In addition to being prone to leakage, they often require maintenance while in operation in which case the bolts are either retightened as in hot torquing or untightened to be replaced. Although costly shutdowns are avoided, such maintenance work exposes the operator to a potential risk because the bolt load alteration can produce a gasket load unbalance, which results in the local gasket contact stress to drop below some critical value, causing major leak and hence jeopardizing the life of the worker. This paper addresses the issue of the contact stress level unbalance around the flange when the bolts are subjected to initial tightening. The study compares the contact stress distribution variations, an analytical developed model based on the theory of rings on elastic foundation, to those given by the finite element model and the simple beam on elastic foundation model developed by (2007, “Flange Joint Bolt Spacing Requirements,” Proceedings of PVP2007, ASME Pressure Vessel and Piping Division Conference ). This study is developed for the purpose of helping limit the degree of load increase in hot torquing or the maximum number of bolts to be replaced at a time and identify those flanges for which the bolt cannot be replaced in service.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleEffect of Bolt Spacing on the Circumferential Distribution of the Gasket Contact Stress in Bolted Flange Joints
dc.typeJournal Paper
dc.journal.volume133
dc.journal.issue4
dc.journal.titleJournal of Pressure Vessel Technology
dc.identifier.doi10.1115/1.4002924
dc.journal.fristpage41205
dc.identifier.eissn1528-8978
dc.keywordsStress
dc.keywordsGaskets
dc.keywordsFlanges
dc.keywordsBolted flanges
dc.keywordsLeakage AND Rotation
dc.treeJournal of Pressure Vessel Technology:;2011:;volume( 133 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record