| contributor author | Judson Woods | |
| contributor author | John S. Gulliver | |
| date accessioned | 2017-05-08T22:41:47Z | |
| date available | 2017-05-08T22:41:47Z | |
| date copyright | April 1990 | |
| date issued | 1990 | |
| identifier other | %28asce%290733-9402%281990%29116%3A1%281%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/86846 | |
| description abstract | The lack of precision in an economic analysis of an energy production facility is expressed quantitatively with an uncertainty to the 68% confidence level. The sensitivities of various parameters to imperfect projections is propagated through a fairly simple technique into an overall uncertainty for the feasibility indicator, such as benefit‐cost (BC) ratio. The technique assumes that each of the variable parameters is unrelated, from a Gaussian population, and that the individual sensitivities have a normal probability distribution. The effects of these assumptions on applications of the uncertainty technique are described. The technique is illustrated through a case study involving the economic analyses of hydropower feasibility. | |
| publisher | American Society of Civil Engineers | |
| title | Economic Analysis of Energy Projects with Uncertainty | |
| type | Journal Paper | |
| journal volume | 116 | |
| journal issue | 1 | |
| journal title | Journal of Energy Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9402(1990)116:1(1) | |
| tree | Journal of Energy Engineering:;1990:;Volume ( 116 ):;issue: 001 | |
| contenttype | Fulltext | |