contributor author | Ahmed B. Senouci | |
contributor author | Hojjat Adeli | |
date accessioned | 2017-05-08T22:41:45Z | |
date available | 2017-05-08T22:41:45Z | |
date copyright | February 2001 | |
date issued | 2001 | |
identifier other | %28asce%290733-9364%282001%29127%3A1%2828%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/86822 | |
description abstract | This paper presents a mathematical model for resource scheduling considering project scheduling characteristics generally ignored in prior research, including precedence relationships, multiple crew-strategies, and time cost trade-off. Previous resource scheduling formulations have traditionally focused on project duration minimization. The proposed model considers the total project cost minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The proposed model is solved using the patented neural dynamics model of Adeli and Park. A case study is presented to demonstrate the performance of the method under various resource availability profiles. | |
publisher | American Society of Civil Engineers | |
title | Resource Scheduling Using Neural Dynamics Model of Adeli and Park | |
type | Journal Paper | |
journal volume | 127 | |
journal issue | 1 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)0733-9364(2001)127:1(28) | |
tree | Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 001 | |
contenttype | Fulltext | |