YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 001
    Author:
    Feniosky Peña-Mora
    ,
    Michael Li
    DOI: 10.1061/(ASCE)0733-9364(2001)127:1(1)
    Publisher: American Society of Civil Engineers
    Abstract: A dynamic planning and control methodology is developed by integrating the applications of axiomatic design concepts, concurrent engineering concepts, the graphical evaluation and review technique (GERT), and the system dynamics modeling technique. The goal of the proposed methodology is to help create a dynamic project plan for design/build fast-track civil engineering and architectural projects where unforeseen changes can be absorbed in the project schedule without creating major interruptions. The axiomatic design concepts are applied to formulate and evaluate various work methodologies, and to create a project plan based on the selected work methodology. The concept of concurrent engineering is adapted to develop a fast-tracking framework based on the task production rate, the upstream task reliability, and downstream task sensitivity to the upstream error. The GERT diagramming scheme is used to calculate the project duration probabilistically by incorporating the possible branches and loops in the project. The system dynamics modeling technique is applied to analyze the causality links of relevant factors in the construction system, and further identifies the important variables that determine the success of a particular overlapping strategy. Consequently, with a rigorous and systemized methodology to help project planning, potential problems can be addressed early before construction. The overall increase in productivity and efficiency as a result of a better planning process can consequently promote the competitiveness of the construction industry.
    • Download: (405.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/86800
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorFeniosky Peña-Mora
    contributor authorMichael Li
    date accessioned2017-05-08T22:41:44Z
    date available2017-05-08T22:41:44Z
    date copyrightFebruary 2001
    date issued2001
    identifier other%28asce%290733-9364%282001%29127%3A1%281%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86800
    description abstractA dynamic planning and control methodology is developed by integrating the applications of axiomatic design concepts, concurrent engineering concepts, the graphical evaluation and review technique (GERT), and the system dynamics modeling technique. The goal of the proposed methodology is to help create a dynamic project plan for design/build fast-track civil engineering and architectural projects where unforeseen changes can be absorbed in the project schedule without creating major interruptions. The axiomatic design concepts are applied to formulate and evaluate various work methodologies, and to create a project plan based on the selected work methodology. The concept of concurrent engineering is adapted to develop a fast-tracking framework based on the task production rate, the upstream task reliability, and downstream task sensitivity to the upstream error. The GERT diagramming scheme is used to calculate the project duration probabilistically by incorporating the possible branches and loops in the project. The system dynamics modeling technique is applied to analyze the causality links of relevant factors in the construction system, and further identifies the important variables that determine the success of a particular overlapping strategy. Consequently, with a rigorous and systemized methodology to help project planning, potential problems can be addressed early before construction. The overall increase in productivity and efficiency as a result of a better planning process can consequently promote the competitiveness of the construction industry.
    publisherAmerican Society of Civil Engineers
    titleDynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects
    typeJournal Paper
    journal volume127
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2001)127:1(1)
    treeJournal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian