YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Weekend Closure for Construction of Asphalt Overlay on Urban Highway

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 004
    Author:
    Phillip S. Dunston
    ,
    Bonnie M. Savage
    ,
    Fred L. Mannering
    DOI: 10.1061/(ASCE)0733-9364(2000)126:4(313)
    Publisher: American Society of Civil Engineers
    Abstract: Construction of asphalt overlays for urban highways is generally restricted to off-peak hours, often exclusively nighttime hours, and to partial closures to minimize public inconvenience. Such constraints are thought to adversely affect production and quality. In August 1997, the Washington State Department of Transportation implemented a pilot project to evaluate the option of a full weekend closure—closure of all lanes in a single direction throughout designated weekend hours—as an alternative to nighttime closures. Two concerns were consistent construction quality between nighttime and daytime paving and general comparison of the full weekend closure with other closure strategies. Surface smoothness (rideability) and in-place density were compared between nighttime and daytime mainline paving for this project, and gradation and asphalt cement content variabilities were compared with published average values. Production rates were compared to those from a comparably sized nighttime project. The investigation revealed that consistent quality, exceeding reported average values, may be achieved. High paving production rates resulted from close proximity of the hot mix plant to the work zone.
    • Download: (88.36Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Weekend Closure for Construction of Asphalt Overlay on Urban Highway

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/86545
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPhillip S. Dunston
    contributor authorBonnie M. Savage
    contributor authorFred L. Mannering
    date accessioned2017-05-08T22:41:20Z
    date available2017-05-08T22:41:20Z
    date copyrightJuly 2000
    date issued2000
    identifier other%28asce%290733-9364%282000%29126%3A4%28313%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86545
    description abstractConstruction of asphalt overlays for urban highways is generally restricted to off-peak hours, often exclusively nighttime hours, and to partial closures to minimize public inconvenience. Such constraints are thought to adversely affect production and quality. In August 1997, the Washington State Department of Transportation implemented a pilot project to evaluate the option of a full weekend closure—closure of all lanes in a single direction throughout designated weekend hours—as an alternative to nighttime closures. Two concerns were consistent construction quality between nighttime and daytime paving and general comparison of the full weekend closure with other closure strategies. Surface smoothness (rideability) and in-place density were compared between nighttime and daytime mainline paving for this project, and gradation and asphalt cement content variabilities were compared with published average values. Production rates were compared to those from a comparably sized nighttime project. The investigation revealed that consistent quality, exceeding reported average values, may be achieved. High paving production rates resulted from close proximity of the hot mix plant to the work zone.
    publisherAmerican Society of Civil Engineers
    titleWeekend Closure for Construction of Asphalt Overlay on Urban Highway
    typeJournal Paper
    journal volume126
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2000)126:4(313)
    treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian