YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Using Risk Analysis to Determine Construction Project Contingencies

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    Author:
    Stephen Mak
    ,
    David Picken
    DOI: 10.1061/(ASCE)0733-9364(2000)126:2(130)
    Publisher: American Society of Civil Engineers
    Abstract: A contingency allowance is an amount of money used to provide for uncertainties associated with a construction project. Traditionally, it is a percentage addition on top of the base estimate. Estimating using risk analysis (ERA) is a methodology that can be used to substantiate the contingency by identifying uncertainties and estimating their financial implications. A study of the effect of ERA was carried out to compare the variability and consistency of the contingency estimates between non-ERA and ERA projects. This paper presents results of a survey that compares a total of 287 non-ERA and 45 ERA projects. The results show a highly significant difference in variation and consistency between these groups. It indicates successful use of the ERA method for public works projects to reduce unnecessary and exaggerated allowance for risk. However, the contingency allowance for ERA projects was still considered high. Improvement and refinement of the ERA method as well as recommendations on capital budgeting policy are suggested.
    • Download: (124.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Using Risk Analysis to Determine Construction Project Contingencies

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/86245
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorStephen Mak
    contributor authorDavid Picken
    date accessioned2017-05-08T22:40:52Z
    date available2017-05-08T22:40:52Z
    date copyrightMarch 2000
    date issued2000
    identifier other%28asce%290733-9364%282000%29126%3A2%28130%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/86245
    description abstractA contingency allowance is an amount of money used to provide for uncertainties associated with a construction project. Traditionally, it is a percentage addition on top of the base estimate. Estimating using risk analysis (ERA) is a methodology that can be used to substantiate the contingency by identifying uncertainties and estimating their financial implications. A study of the effect of ERA was carried out to compare the variability and consistency of the contingency estimates between non-ERA and ERA projects. This paper presents results of a survey that compares a total of 287 non-ERA and 45 ERA projects. The results show a highly significant difference in variation and consistency between these groups. It indicates successful use of the ERA method for public works projects to reduce unnecessary and exaggerated allowance for risk. However, the contingency allowance for ERA projects was still considered high. Improvement and refinement of the ERA method as well as recommendations on capital budgeting policy are suggested.
    publisherAmerican Society of Civil Engineers
    titleUsing Risk Analysis to Determine Construction Project Contingencies
    typeJournal Paper
    journal volume126
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2000)126:2(130)
    treeJournal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian