Generic Methodology for Analyzing Delay ClaimsSource: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 006Author:Saied Kartam
DOI: 10.1061/(ASCE)0733-9364(1999)125:6(409)Publisher: American Society of Civil Engineers
Abstract: It is common for a construction project to encounter delays. There are several reasons that can contribute to delaying a project. Analyzing the various causes that contribute to a project's delay is an important task to resolving it. Determining, in a scientific manner, the impact, timing, and the contributing effect of each of those causes to the overall delay should assist in helping the parties settle the delay without litigation. Project participants are becoming more aware of the high costs and risks associated with delay claims and their litigation. Thus, the construction industry needs to develop methodologies and techniques to prevent and more efficiently resolve delay claims. While many practitioners have been following some kind of a methodology for analyzing delay claims, a written exposition of such a methodology is not widely available in the literature. Thus, this paper presents a written exposition of a generic methodology for analyzing delay claims. This methodology has been developed and successfully used, by the writer, in various projects to resolve delay claims. The developed methodology will be illustrated through its application in those projects. Moreover, this methodology shows that while there are several techniques for analyzing delay claims, very few of these can be considered adequate. The use of such an adequate technique is a key in obtaining a fair allocation of the delay responsibility. This paper's methodology utilizes one of these few adequate techniques for analyzing delay claims.
|
Show full item record
| contributor author | Saied Kartam | |
| date accessioned | 2017-05-08T22:40:31Z | |
| date available | 2017-05-08T22:40:31Z | |
| date copyright | December 1999 | |
| date issued | 1999 | |
| identifier other | %28asce%290733-9364%281999%29125%3A6%28409%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/86023 | |
| description abstract | It is common for a construction project to encounter delays. There are several reasons that can contribute to delaying a project. Analyzing the various causes that contribute to a project's delay is an important task to resolving it. Determining, in a scientific manner, the impact, timing, and the contributing effect of each of those causes to the overall delay should assist in helping the parties settle the delay without litigation. Project participants are becoming more aware of the high costs and risks associated with delay claims and their litigation. Thus, the construction industry needs to develop methodologies and techniques to prevent and more efficiently resolve delay claims. While many practitioners have been following some kind of a methodology for analyzing delay claims, a written exposition of such a methodology is not widely available in the literature. Thus, this paper presents a written exposition of a generic methodology for analyzing delay claims. This methodology has been developed and successfully used, by the writer, in various projects to resolve delay claims. The developed methodology will be illustrated through its application in those projects. Moreover, this methodology shows that while there are several techniques for analyzing delay claims, very few of these can be considered adequate. The use of such an adequate technique is a key in obtaining a fair allocation of the delay responsibility. This paper's methodology utilizes one of these few adequate techniques for analyzing delay claims. | |
| publisher | American Society of Civil Engineers | |
| title | Generic Methodology for Analyzing Delay Claims | |
| type | Journal Paper | |
| journal volume | 125 | |
| journal issue | 6 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(1999)125:6(409) | |
| tree | Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 006 | |
| contenttype | Fulltext |