YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Models for Assessing Hoisting Times of Tower Cranes

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 006
    Author:
    Arthur W. T. Leung
    ,
    C. M. Tam
    DOI: 10.1061/(ASCE)0733-9364(1999)125:6(385)
    Publisher: American Society of Civil Engineers
    Abstract: Accurate assessment of hoisting times is crucial for planning construction activities. The objective of this paper is to develop reasonably accurate prediction models to assess hoisting times of tower cranes. Twenty variables considered attributable to the hoisting time are evaluated. In modeling the hoisting movements, the upward hoisting and downward hoisting of a hoisting cycle are classified as the supply hoisting and the return hoisting. Multiple regression techniques are used for analyzing and building up the models. The hoisting of precast concrete facades and concrete skips are studied. The significance of the variables are discussed and compared. Finally, the paper presents an example of applying the models.
    • Download: (176.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Models for Assessing Hoisting Times of Tower Cranes

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85990
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorArthur W. T. Leung
    contributor authorC. M. Tam
    date accessioned2017-05-08T22:40:28Z
    date available2017-05-08T22:40:28Z
    date copyrightDecember 1999
    date issued1999
    identifier other%28asce%290733-9364%281999%29125%3A6%28385%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85990
    description abstractAccurate assessment of hoisting times is crucial for planning construction activities. The objective of this paper is to develop reasonably accurate prediction models to assess hoisting times of tower cranes. Twenty variables considered attributable to the hoisting time are evaluated. In modeling the hoisting movements, the upward hoisting and downward hoisting of a hoisting cycle are classified as the supply hoisting and the return hoisting. Multiple regression techniques are used for analyzing and building up the models. The hoisting of precast concrete facades and concrete skips are studied. The significance of the variables are discussed and compared. Finally, the paper presents an example of applying the models.
    publisherAmerican Society of Civil Engineers
    titleModels for Assessing Hoisting Times of Tower Cranes
    typeJournal Paper
    journal volume125
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1999)125:6(385)
    treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian