YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Application of Mathematical Matrix to Integrate Project Schedule and Cost

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 005
    Author:
    Hyun-Soo Lee
    ,
    Kyoo Jin Yi
    DOI: 10.1061/(ASCE)0733-9364(1999)125:5(339)
    Publisher: American Society of Civil Engineers
    Abstract: This research is a numerical approach to the integration of the time and cost data sets for construction projects, which addresses the conflicts between them. Mathematical matrices are introduced to show the interrelationships between the time and cost data sets and their effect on each other, and to solve the conflict due to the differences between work breakdown structure and cost breakdown structure. Several matrices of time and cost data sets of construction projects are defined. The interrelationships among the matrices are investigated and several time- and cost-related matrix equations are presented. Based on the equations, this research develops a project planning and control algorithm that estimates the expected project cost and duration and evaluates the project economy using the matrix equations derived here. The matrix application is implemented through a spreadsheet program in which the matrices are automatically connected with each other. A case study involving a housing project is performed to verify the capability and utility of this computerized matrix application in integrating project time and cost.
    • Download: (482.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Application of Mathematical Matrix to Integrate Project Schedule and Cost

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85946
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHyun-Soo Lee
    contributor authorKyoo Jin Yi
    date accessioned2017-05-08T22:40:25Z
    date available2017-05-08T22:40:25Z
    date copyrightSeptember 1999
    date issued1999
    identifier other%28asce%290733-9364%281999%29125%3A5%28339%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85946
    description abstractThis research is a numerical approach to the integration of the time and cost data sets for construction projects, which addresses the conflicts between them. Mathematical matrices are introduced to show the interrelationships between the time and cost data sets and their effect on each other, and to solve the conflict due to the differences between work breakdown structure and cost breakdown structure. Several matrices of time and cost data sets of construction projects are defined. The interrelationships among the matrices are investigated and several time- and cost-related matrix equations are presented. Based on the equations, this research develops a project planning and control algorithm that estimates the expected project cost and duration and evaluates the project economy using the matrix equations derived here. The matrix application is implemented through a spreadsheet program in which the matrices are automatically connected with each other. A case study involving a housing project is performed to verify the capability and utility of this computerized matrix application in integrating project time and cost.
    publisherAmerican Society of Civil Engineers
    titleApplication of Mathematical Matrix to Integrate Project Schedule and Cost
    typeJournal Paper
    journal volume125
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1999)125:5(339)
    treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian