YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Political Risks: Analysis of Key Contract Clauses in China's BOT Project

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
    Author:
    Shou Qing Wang
    ,
    Robert L. K. Tiong
    ,
    Seng Kiong Ting
    ,
    David Ashley
    DOI: 10.1061/(ASCE)0733-9364(1999)125:3(190)
    Publisher: American Society of Civil Engineers
    Abstract: The reforms introduced by the International Monetary Fund in Asia will bring about greater transparency in the economies and innovative approaches in procurement of contracts. China has taken new initiatives in build, operate, and transfer (BOT) infrastructure projects. It is, however, important to analyze and manage the unique or critical risks associated with China's BOT projects. This is especially so after new policies were introduced in late 1996 when the first state-approved BOT project, the U.S. $650,000,000 2 × 350 MW coal-fired Laibin B Power Plant (Laibin B), was awarded. These include the competitive tendering process and 100% foreign ownership of the operating company. An international survey on risk management of BOT projects in China was conducted to seek the views of practitioners. The overall objectives of the survey are (1) to identify the unique or critical risks associated with China's BOT projects; (2) to evaluate the effectiveness of measures for mitigating these risks; (3) to examine the key contract clauses used in Laibin B's concession agreement; and (4) to provide a risk management framework for investing in future BOT projects in China. This paper discusses the adequacy of key contract clauses in Laibin B's concession agreement related to the political and force majeure risks in China, from the perspective of foreign developers, lawyers, and lenders. The contract clauses discussed include changes in law, corruption, delay in approval, expropriation, and force majeure. Areas for further improvement in the clauses are suggested.
    • Download: (93.57Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Political Risks: Analysis of Key Contract Clauses in China's BOT Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85689
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorShou Qing Wang
    contributor authorRobert L. K. Tiong
    contributor authorSeng Kiong Ting
    contributor authorDavid Ashley
    date accessioned2017-05-08T22:40:00Z
    date available2017-05-08T22:40:00Z
    date copyrightJune 1999
    date issued1999
    identifier other%28asce%290733-9364%281999%29125%3A3%28190%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85689
    description abstractThe reforms introduced by the International Monetary Fund in Asia will bring about greater transparency in the economies and innovative approaches in procurement of contracts. China has taken new initiatives in build, operate, and transfer (BOT) infrastructure projects. It is, however, important to analyze and manage the unique or critical risks associated with China's BOT projects. This is especially so after new policies were introduced in late 1996 when the first state-approved BOT project, the U.S. $650,000,000 2 × 350 MW coal-fired Laibin B Power Plant (Laibin B), was awarded. These include the competitive tendering process and 100% foreign ownership of the operating company. An international survey on risk management of BOT projects in China was conducted to seek the views of practitioners. The overall objectives of the survey are (1) to identify the unique or critical risks associated with China's BOT projects; (2) to evaluate the effectiveness of measures for mitigating these risks; (3) to examine the key contract clauses used in Laibin B's concession agreement; and (4) to provide a risk management framework for investing in future BOT projects in China. This paper discusses the adequacy of key contract clauses in Laibin B's concession agreement related to the political and force majeure risks in China, from the perspective of foreign developers, lawyers, and lenders. The contract clauses discussed include changes in law, corruption, delay in approval, expropriation, and force majeure. Areas for further improvement in the clauses are suggested.
    publisherAmerican Society of Civil Engineers
    titlePolitical Risks: Analysis of Key Contract Clauses in China's BOT Project
    typeJournal Paper
    journal volume125
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1999)125:3(190)
    treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian