YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Physiological Demands of Concrete Slab Placing and Finishing Work

    Source: Journal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 001
    Author:
    Tariq S. Abdelhamid
    ,
    John G. Everett
    DOI: 10.1061/(ASCE)0733-9364(1999)125:1(47)
    Publisher: American Society of Civil Engineers
    Abstract: Construction craft work is physically demanding. As a result, many craft workers become excessively fatigued, which may lead to decreased productivity and motivation, inattentiveness, poor judgment, poor quality work, job dissatisfaction, accidents, and injuries. This paper investigates the feasibility of measuring in situ physical demands of concrete slab placing and finishing work and how this physical demand may be used to characterize both work intensity and whether the demands are physically fatiguing to the workers. Physiological measures of energy expenditure, including oxygen consumption and heart rate data, were collected for an eight-member concrete slab placing and finishing crew performing actual construction work. The results reveal that most of the crew members who were performing manual work experienced heavy physical demands and more potential for physical fatigue compared with those operating construction machinery and equipment. These workers routinely exceed one or more published guidelines for acceptable levels of energy expenditure, oxygen consumption, and heart rate. The methods described in this paper have wide application in identifying excessively demanding construction tasks so the work can be modified and productivity improved.
    • Download: (92.86Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Physiological Demands of Concrete Slab Placing and Finishing Work

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85489
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTariq S. Abdelhamid
    contributor authorJohn G. Everett
    date accessioned2017-05-08T22:39:41Z
    date available2017-05-08T22:39:41Z
    date copyrightJanuary 1999
    date issued1999
    identifier other%28asce%290733-9364%281999%29125%3A1%2847%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85489
    description abstractConstruction craft work is physically demanding. As a result, many craft workers become excessively fatigued, which may lead to decreased productivity and motivation, inattentiveness, poor judgment, poor quality work, job dissatisfaction, accidents, and injuries. This paper investigates the feasibility of measuring in situ physical demands of concrete slab placing and finishing work and how this physical demand may be used to characterize both work intensity and whether the demands are physically fatiguing to the workers. Physiological measures of energy expenditure, including oxygen consumption and heart rate data, were collected for an eight-member concrete slab placing and finishing crew performing actual construction work. The results reveal that most of the crew members who were performing manual work experienced heavy physical demands and more potential for physical fatigue compared with those operating construction machinery and equipment. These workers routinely exceed one or more published guidelines for acceptable levels of energy expenditure, oxygen consumption, and heart rate. The methods described in this paper have wide application in identifying excessively demanding construction tasks so the work can be modified and productivity improved.
    publisherAmerican Society of Civil Engineers
    titlePhysiological Demands of Concrete Slab Placing and Finishing Work
    typeJournal Paper
    journal volume125
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1999)125:1(47)
    treeJournal of Construction Engineering and Management:;1999:;Volume ( 125 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian