Show simple item record

contributor authorMark Konchar
contributor authorVictor Sanvido
date accessioned2017-05-08T22:39:29Z
date available2017-05-08T22:39:29Z
date copyrightDecember 1998
date issued1998
identifier other%28asce%290733-9364%281998%29124%3A6%28435%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85334
description abstractConstruction management at risk, design/build and design/bid/build are three principal project delivery systems used in the United States today. This paper empirically compares cost, schedule, and quality performance of these three project delivery systems, using project-specific data collected from 351 U.S. building projects. The study included collecting, checking, and validating industry data, significance testing of univariate comparisons and the statistical development of multivariate linear regression models for predicting average project performance. A nonresponse study verified statistically that collected data were appropriate for analysis and representative of the industry from which they were drawn. Significance testing and multivariate comparisons used nearly 100 explanatory and interacting variables to explain project cost, schedule, and quality performance. Specific comparisons between project delivery systems, performance metrics, and six facility classes are discussed. Results and the level of confidence that surrounds each finding are presented.
publisherAmerican Society of Civil Engineers
titleComparison of U.S. Project Delivery Systems
typeJournal Paper
journal volume124
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1998)124:6(435)
treeJournal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record