YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Lane Rental—Innovative Way to Reduce Road Construction Time

    Source: Journal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 005
    Author:
    Zohar J. Herbsman
    ,
    Charles R. Glagola
    DOI: 10.1061/(ASCE)0733-9364(1998)124:5(411)
    Publisher: American Society of Civil Engineers
    Abstract: In recent years the public has faced a substantial increase in the number of transportation projects that are being constructed in urban areas under heavy traffic. This type of construction is causing the public major inconvenience, is increasing the number of accidents, and is causing substantial losses to the business community in the affected areas. Because of a perception that contractors focus only on their obligations of meeting budget and schedule considerations under conventional contracting methods and that they do not consider the inconvenience to the public caused by construction work, new contracting methods have been developed that specifically address this problem. This paper describes a method that has been used in the United Kingdom called lane rental. The lane rental method combines the cost to the using public for the closing of urban traffic routes with the traditional costs of construction. Under this system, contractors are required to consider, and include, both of these costs in the bidding process. The principles of lane rental and the adaptation to the construction industry environment in the United States are discussed in this paper. Two case studies of projects that are bid under lane rental provisions and the lessons that can be learned from those cases are described in this paper.
    • Download: (955.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Lane Rental—Innovative Way to Reduce Road Construction Time

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85290
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorZohar J. Herbsman
    contributor authorCharles R. Glagola
    date accessioned2017-05-08T22:39:25Z
    date available2017-05-08T22:39:25Z
    date copyrightSeptember 1998
    date issued1998
    identifier other%28asce%290733-9364%281998%29124%3A5%28411%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85290
    description abstractIn recent years the public has faced a substantial increase in the number of transportation projects that are being constructed in urban areas under heavy traffic. This type of construction is causing the public major inconvenience, is increasing the number of accidents, and is causing substantial losses to the business community in the affected areas. Because of a perception that contractors focus only on their obligations of meeting budget and schedule considerations under conventional contracting methods and that they do not consider the inconvenience to the public caused by construction work, new contracting methods have been developed that specifically address this problem. This paper describes a method that has been used in the United Kingdom called lane rental. The lane rental method combines the cost to the using public for the closing of urban traffic routes with the traditional costs of construction. Under this system, contractors are required to consider, and include, both of these costs in the bidding process. The principles of lane rental and the adaptation to the construction industry environment in the United States are discussed in this paper. Two case studies of projects that are bid under lane rental provisions and the lessons that can be learned from those cases are described in this paper.
    publisherAmerican Society of Civil Engineers
    titleLane Rental—Innovative Way to Reduce Road Construction Time
    typeJournal Paper
    journal volume124
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1998)124:5(411)
    treeJournal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian