YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Linear Scheduling Model: Development of Controlling Activity Path

    Source: Journal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 004
    Author:
    David J. Harmelink
    ,
    James E. Rowings
    DOI: 10.1061/(ASCE)0733-9364(1998)124:4(263)
    Publisher: American Society of Civil Engineers
    Abstract: There are several reasons why linear scheduling techniques have not been applied widely to construction projects even though they have been identified as very useful. If we consider the capabilities and the widespread use of critical-path method (CPM) in the construction industry, some of the reasons why linear scheduling is not popular become evident. There is an abundance of highly developed CPM computer applications available today. These applications provide a rich set of capabilities such as resource and cost allocation, progress reporting, and schedule updating, plus the generation of a multitude of reports and graphics. There are no comparable applications for linear scheduling. The reason for the shortage of applications is that linear scheduling typically has been regarded as a visual technique lacking the analytical qualities of the CPM of scheduling. Fundamental to linear scheduling's lack of an analytical perspective is its inability to determine a critical path. This paper documents a method by which a controlling activity path can be determined in a linear schedule. This fundamental ability further forms the basis for the determination of float for noncontrolling activities and provides a means of statusing and updating linear schedules.
    • Download: (621.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Linear Scheduling Model: Development of Controlling Activity Path

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85090
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDavid J. Harmelink
    contributor authorJames E. Rowings
    date accessioned2017-05-08T22:39:05Z
    date available2017-05-08T22:39:05Z
    date copyrightJuly 1998
    date issued1998
    identifier other%28asce%290733-9364%281998%29124%3A4%28263%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85090
    description abstractThere are several reasons why linear scheduling techniques have not been applied widely to construction projects even though they have been identified as very useful. If we consider the capabilities and the widespread use of critical-path method (CPM) in the construction industry, some of the reasons why linear scheduling is not popular become evident. There is an abundance of highly developed CPM computer applications available today. These applications provide a rich set of capabilities such as resource and cost allocation, progress reporting, and schedule updating, plus the generation of a multitude of reports and graphics. There are no comparable applications for linear scheduling. The reason for the shortage of applications is that linear scheduling typically has been regarded as a visual technique lacking the analytical qualities of the CPM of scheduling. Fundamental to linear scheduling's lack of an analytical perspective is its inability to determine a critical path. This paper documents a method by which a controlling activity path can be determined in a linear schedule. This fundamental ability further forms the basis for the determination of float for noncontrolling activities and provides a means of statusing and updating linear schedules.
    publisherAmerican Society of Civil Engineers
    titleLinear Scheduling Model: Development of Controlling Activity Path
    typeJournal Paper
    journal volume124
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1998)124:4(263)
    treeJournal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian