YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Resource Leveling of Linear Schedules Using Integer Linear Programming

    Source: Journal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 003
    Author:
    Kris G. Mattila
    ,
    Dulcy M. Abraham
    DOI: 10.1061/(ASCE)0733-9364(1998)124:3(232)
    Publisher: American Society of Civil Engineers
    Abstract: Since the early 1960s many techniques have been developed to plan and schedule linear construction projects. However, one, the critical path method (CPM), overshadowed the others. As a result, CPM developed into the powerful and effective tool that it is today. However, research has indicated that CPM is ineffective for linear construction. Linear construction projects are typified by activities that must be repeated in different locations such as highways, pipelines, and tunnels. Recently, there has been renewed interest in linear scheduling. Much of this interest has involved a technique called the linear scheduling method (LSM). Only recently has there been the ability to calculate the controlling activities of a linear schedule, independent of network analysis. Additional research needs to be done to develop some of the techniques available in CPM into comparable ones for linear scheduling. One of these techniques is resource leveling. This paper uses the vehicle of a highway construction project to present an integer linear programming formulation to level the resources of linear projects.
    • Download: (1.423Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Resource Leveling of Linear Schedules Using Integer Linear Programming

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/85057
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKris G. Mattila
    contributor authorDulcy M. Abraham
    date accessioned2017-05-08T22:39:02Z
    date available2017-05-08T22:39:02Z
    date copyrightMay 1998
    date issued1998
    identifier other%28asce%290733-9364%281998%29124%3A3%28232%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/85057
    description abstractSince the early 1960s many techniques have been developed to plan and schedule linear construction projects. However, one, the critical path method (CPM), overshadowed the others. As a result, CPM developed into the powerful and effective tool that it is today. However, research has indicated that CPM is ineffective for linear construction. Linear construction projects are typified by activities that must be repeated in different locations such as highways, pipelines, and tunnels. Recently, there has been renewed interest in linear scheduling. Much of this interest has involved a technique called the linear scheduling method (LSM). Only recently has there been the ability to calculate the controlling activities of a linear schedule, independent of network analysis. Additional research needs to be done to develop some of the techniques available in CPM into comparable ones for linear scheduling. One of these techniques is resource leveling. This paper uses the vehicle of a highway construction project to present an integer linear programming formulation to level the resources of linear projects.
    publisherAmerican Society of Civil Engineers
    titleResource Leveling of Linear Schedules Using Integer Linear Programming
    typeJournal Paper
    journal volume124
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1998)124:3(232)
    treeJournal of Construction Engineering and Management:;1998:;Volume ( 124 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian