YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Boiler Erection Scheduling Using Product Models and Case-Based Reasoning

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    Author:
    Ren-Jye Dzeng
    ,
    Iris D. Tommelein
    DOI: 10.1061/(ASCE)0733-9364(1997)123:3(338)
    Publisher: American Society of Civil Engineers
    Abstract: Contractors who repeatedly construct facilities designed by copying major parts from one project to the next find that previously developed schedules associated with those designs could be reused to schedule new work. To facilitate such reuse, project characteristics must be articulated and associated schedules described to include not only traditional, numerical scheduling data, but also scheduling constraints. In addition, knowledge about how to reuse schedules must be available. The CasePlan system, presented here, supports and augments the scheduling activity of people who reason about cases—each case describing the design and schedule of a completed project—to generate new project schedules. Specifically, CasePlan reuses annotated cases to automatically schedule the erection of power plant boilers. Because such boilers have a more-or-less standardized design, a generic boiler product model can serve as the basis for assessing similarities between designs. On this basis CasePlan selects schedules for reuse. A user can also interact with CasePlan to isolate fragments of case schedules and adapt them to better suit the variables of the new project at hand.
    • Download: (1.293Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Boiler Erection Scheduling Using Product Models and Case-Based Reasoning

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/84578
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRen-Jye Dzeng
    contributor authorIris D. Tommelein
    date accessioned2017-05-08T22:38:16Z
    date available2017-05-08T22:38:16Z
    date copyrightSeptember 1997
    date issued1997
    identifier other%28asce%290733-9364%281997%29123%3A3%28338%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84578
    description abstractContractors who repeatedly construct facilities designed by copying major parts from one project to the next find that previously developed schedules associated with those designs could be reused to schedule new work. To facilitate such reuse, project characteristics must be articulated and associated schedules described to include not only traditional, numerical scheduling data, but also scheduling constraints. In addition, knowledge about how to reuse schedules must be available. The CasePlan system, presented here, supports and augments the scheduling activity of people who reason about cases—each case describing the design and schedule of a completed project—to generate new project schedules. Specifically, CasePlan reuses annotated cases to automatically schedule the erection of power plant boilers. Because such boilers have a more-or-less standardized design, a generic boiler product model can serve as the basis for assessing similarities between designs. On this basis CasePlan selects schedules for reuse. A user can also interact with CasePlan to isolate fragments of case schedules and adapt them to better suit the variables of the new project at hand.
    publisherAmerican Society of Civil Engineers
    titleBoiler Erection Scheduling Using Product Models and Case-Based Reasoning
    typeJournal Paper
    journal volume123
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1997)123:3(338)
    treeJournal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian