YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Delay Reporting Within Cost Accounting System

    Source: Journal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 002
    Author:
    David F. Rogge
    DOI: 10.1061/(ASCE)0733-9364(1984)110:2(289)
    Publisher: American Society of Civil Engineers
    Abstract: There is an imbalance in the visibility of costs of delays in the daily construction site work routine and the costs of overhead expenditures which to a large extent determine the magnitude of these delays. This imbalance frequently means that overhead expenditures are carefully scrutinized while delay costs may be totally ignored. The resulting suboptimization may not result in the lowest total project cost. A procedure is proposed to address this problem. The procedure works within existing cost accounting systems and is a modification of existing foreman-delay survey methods.
    • Download: (253.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Delay Reporting Within Cost Accounting System

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/84167
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDavid F. Rogge
    date accessioned2017-05-08T22:37:30Z
    date available2017-05-08T22:37:30Z
    date copyrightMarch 1984
    date issued1984
    identifier other%28asce%290733-9364%281984%29110%3A2%28289%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/84167
    description abstractThere is an imbalance in the visibility of costs of delays in the daily construction site work routine and the costs of overhead expenditures which to a large extent determine the magnitude of these delays. This imbalance frequently means that overhead expenditures are carefully scrutinized while delay costs may be totally ignored. The resulting suboptimization may not result in the lowest total project cost. A procedure is proposed to address this problem. The procedure works within existing cost accounting systems and is a modification of existing foreman-delay survey methods.
    publisherAmerican Society of Civil Engineers
    titleDelay Reporting Within Cost Accounting System
    typeJournal Paper
    journal volume110
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1984)110:2(289)
    treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian