YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Representative: Scheduling and Cost Management

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 003
    Author:
    Allan F. Samuels
    ,
    Michael J. Bruder
    DOI: 10.1061/(ASCE)0733-9364(1996)122:3(281)
    Publisher: American Society of Civil Engineers
    Abstract: Technically advanced organizations responsible for construction efforts invest up to 15% of the cost of the effort in construction representative manpower and supporting resources. Construction representatives are technically qualified individuals who perform quality actions for customers or buyers of constructed facilities. These actions may include engineering, inspection, materials testing, administration or surveys. This paper discusses a Construction Management Program that schedules manpower and controls costs of construction representatives. This program includes three phases. The planning phase forecasts future construction representative needs for the agencywide effort. The staffing phase schedules and assigns personnel to specific projects after a construction contract has been awarded. The monitoring phase furnishes performance and cost reports that compare actual results with the staffing estimates. The program provides useful information for the improvement of resource utilization and positive control of costs. This construction management program has assisted in a more than 2% reduction in costs of construction representatives for the Arizona Department of Transportation.
    • Download: (1.128Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Representative: Scheduling and Cost Management

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/83934
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAllan F. Samuels
    contributor authorMichael J. Bruder
    date accessioned2017-05-08T22:37:04Z
    date available2017-05-08T22:37:04Z
    date copyrightSeptember 1996
    date issued1996
    identifier other%28asce%290733-9364%281996%29122%3A3%28281%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83934
    description abstractTechnically advanced organizations responsible for construction efforts invest up to 15% of the cost of the effort in construction representative manpower and supporting resources. Construction representatives are technically qualified individuals who perform quality actions for customers or buyers of constructed facilities. These actions may include engineering, inspection, materials testing, administration or surveys. This paper discusses a Construction Management Program that schedules manpower and controls costs of construction representatives. This program includes three phases. The planning phase forecasts future construction representative needs for the agencywide effort. The staffing phase schedules and assigns personnel to specific projects after a construction contract has been awarded. The monitoring phase furnishes performance and cost reports that compare actual results with the staffing estimates. The program provides useful information for the improvement of resource utilization and positive control of costs. This construction management program has assisted in a more than 2% reduction in costs of construction representatives for the Arizona Department of Transportation.
    publisherAmerican Society of Civil Engineers
    titleConstruction Representative: Scheduling and Cost Management
    typeJournal Paper
    journal volume122
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1996)122:3(281)
    treeJournal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian