YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Methods and Procedural Considerations in Demolishing Tall Concrete Chimneys

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 003
    Author:
    Kenneth K. Walker
    ,
    Cliff Schexnayder
    ,
    Richard E. Mayo
    ,
    Kenneth D. Walsh
    DOI: 10.1061/(ASCE)0733-9364(1996)122:3(223)
    Publisher: American Society of Civil Engineers
    Abstract: This paper reports on a study of possible demolition methods for tall concrete chimneys. In particular it discusses a case where the adjoining plant functions had to remain fully operational during the demolition process. Therefore, both operational and cost concerns in relation to demolition methods and procedures are discussed. In fact, operational risk factors can be critical in the selection of demolition methods. It was found that when diamond sawing was chosen as the method for demolishing reinforced-concrete structures, the cutting pattern can have a significant impact on project cost.
    • Download: (1.044Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Methods and Procedural Considerations in Demolishing Tall Concrete Chimneys

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/83857
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorKenneth K. Walker
    contributor authorCliff Schexnayder
    contributor authorRichard E. Mayo
    contributor authorKenneth D. Walsh
    date accessioned2017-05-08T22:36:54Z
    date available2017-05-08T22:36:54Z
    date copyrightSeptember 1996
    date issued1996
    identifier other%28asce%290733-9364%281996%29122%3A3%28223%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83857
    description abstractThis paper reports on a study of possible demolition methods for tall concrete chimneys. In particular it discusses a case where the adjoining plant functions had to remain fully operational during the demolition process. Therefore, both operational and cost concerns in relation to demolition methods and procedures are discussed. In fact, operational risk factors can be critical in the selection of demolition methods. It was found that when diamond sawing was chosen as the method for demolishing reinforced-concrete structures, the cutting pattern can have a significant impact on project cost.
    publisherAmerican Society of Civil Engineers
    titleMethods and Procedural Considerations in Demolishing Tall Concrete Chimneys
    typeJournal Paper
    journal volume122
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1996)122:3(223)
    treeJournal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian