YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Performance of Constructed Facilities
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Numerical Analysis of Ground Surface Settlement Induced by Double-O Tube Shield Tunneling

    Source: Journal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 005
    Author:
    Shong-Loong Chen
    ,
    Shen-Chung Lee
    ,
    Yu-Syuan Wei
    DOI: 10.1061/(ASCE)CF.1943-5509.0000732
    Publisher: American Society of Civil Engineers
    Abstract: This paper is a case study of the Taoyuan International Airport Access Mass Rapid Transit system, the first project in Taiwan constructed with Double-O-Tube (DOT) shield tunneling. The advancing DOT shield tunneling served to induce ground settlement during construction, which thus impacted the safety of buildings and facilities in neighboring areas. A three-dimensional finite-element program was introduced to simulate the DOT shield tunneling process. Five consecutive rounds were excavated by a tunnel-boring machine from a constructed section; then the longitudinal and transverse ground surface settlements were investigated. Three soil models—a Mohr-Coulomb (MC) model, a Hardening Soil (HS) model, and a Hardening Soil model with small strain (HS-Small)—were used during the numerical analysis. Six monitoring sections along the tunnel alignment and field monitoring data were selected for the investigation. From this study, the ground surface settlements analyzed by the MC model were clearly less than those of the other two models. Because the HS-Small model considered soil stiffness to decay nonlinearly with increasing strain amplitude, it thus showed more-realistic modeling compared to the MC and HS models. This phenomenon was especially evident in the soft-soil stratum. This case study sheds some light on future projects of similar nature.
    • Download: (5.103Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Numerical Analysis of Ground Surface Settlement Induced by Double-O Tube Shield Tunneling

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/83335
    Collections
    • Journal of Performance of Constructed Facilities

    Show full item record

    contributor authorShong-Loong Chen
    contributor authorShen-Chung Lee
    contributor authorYu-Syuan Wei
    date accessioned2017-05-08T22:36:00Z
    date available2017-05-08T22:36:00Z
    date copyrightOctober 2016
    date issued2016
    identifier other51376112.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83335
    description abstractThis paper is a case study of the Taoyuan International Airport Access Mass Rapid Transit system, the first project in Taiwan constructed with Double-O-Tube (DOT) shield tunneling. The advancing DOT shield tunneling served to induce ground settlement during construction, which thus impacted the safety of buildings and facilities in neighboring areas. A three-dimensional finite-element program was introduced to simulate the DOT shield tunneling process. Five consecutive rounds were excavated by a tunnel-boring machine from a constructed section; then the longitudinal and transverse ground surface settlements were investigated. Three soil models—a Mohr-Coulomb (MC) model, a Hardening Soil (HS) model, and a Hardening Soil model with small strain (HS-Small)—were used during the numerical analysis. Six monitoring sections along the tunnel alignment and field monitoring data were selected for the investigation. From this study, the ground surface settlements analyzed by the MC model were clearly less than those of the other two models. Because the HS-Small model considered soil stiffness to decay nonlinearly with increasing strain amplitude, it thus showed more-realistic modeling compared to the MC and HS models. This phenomenon was especially evident in the soft-soil stratum. This case study sheds some light on future projects of similar nature.
    publisherAmerican Society of Civil Engineers
    titleNumerical Analysis of Ground Surface Settlement Induced by Double-O Tube Shield Tunneling
    typeJournal Paper
    journal volume30
    journal issue5
    journal titleJournal of Performance of Constructed Facilities
    identifier doi10.1061/(ASCE)CF.1943-5509.0000732
    treeJournal of Performance of Constructed Facilities:;2016:;Volume ( 030 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian