contributor authorShui-Long Shen
contributor authorQing-Long Cui
contributor authorChu-Eu Ho
contributor authorYe-Shuang Xu
date accessioned2017-05-08T22:34:35Z
date available2017-05-08T22:34:35Z
date copyrightMay 2016
date issued2016
identifier other50081711.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/82935
description abstractThis paper presents a case history of the successful application of observational method to instruction microtunneling with successive pipe-jacking. The microtunneling project is the construction of four parallel pipes under Guan River in Jiangsu, China. Four parallel tunnels with external diameter of 4,160 mm and horizontally spaced at 4.8 m apart were jacked over 450 m in cemented silty clay and sand by two slurry-balance microtunnel boring machines (MTBM) at a depth of 4.6 m under the river bed. Since the overburden soil is very thin, proper control of tunneling operations was of utmost importance for maintaining the stability of the river bed. In order to optimize the operation parameters prior to construction under the river bed, a field trial was conducted, which included measurement of ground surface settlement, subsurface settlement, and lateral displacement of the subsurface soils, as well as excess pore water pressure and earth pressure. The relationship between ground response and construction operation parameters is summarized. Appropriate operation parameters were applied during tunneling under Guan River. Although tunneling and pipe jacking under the river was successfully carried out, a difficulty was encountered when the MTBM reached the opposite bank and large settlements were observed. This paper discusses the technical issues faced and lessons learnt from interpretation of the monitoring data collected.
publisherAmerican Society of Civil Engineers
titleGround Response to Multiple Parallel Microtunneling Operations in Cemented Silty Clay and Sand
typeJournal Paper
journal volume142
journal issue5
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)GT.1943-5606.0001441
treeJournal of Geotechnical and Geoenvironmental Engineering:;2016:;Volume ( 142 ):;issue: 005