YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Application of Reference Class Forecasting in Turkish Public Construction Projects: Contractor Perspective

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 003
    Author:
    Savas Bayram
    ,
    Saad Al-Jibouri
    DOI: 10.1061/(ASCE)ME.1943-5479.0000421
    Publisher: American Society of Civil Engineers
    Abstract: Cost overrun in construction projects is an important problem that can have serious financial consequences. It also reduces the effectiveness of planning and decision making not only for the contractor but for all parties involved. The problem keeps occurring despite many attempts made over the years to improve cost estimation and forecasting methods. This paper focuses on analyzing cost overruns in Turkey and comparing the cost estimates produced using the traditional estimating method against cost forecasts produced using the reference class forecasting (RCF) method. RCF is used to predict the final cost of a project predicated on actual cost outcomes of accomplished similar projects in the same reference class. RCF has been so far used to address estimation bias in early project development before design is completed and before all risks are accounted for to help a client to produce a more realistic forecast of the final project cost. In this paper, however, it is used to produce a forecast of the final project cost based on the contract sum. The work described in the paper involves collection of contract sum and final project cost data from 420 completed building projects. In order to test the ability of RCF to produce realistic forecasts of projects’ final costs, 75% of the data are used to produce the cost overruns distribution and to determine the required optimism bias uplift values for the building projects, while the other 25% of the data are used for testing the accuracy of the forecasts produced for the final costs of projects in the established reference class. The results have indicated that the required uplift values are in the range of 4 to 44%. For instance, if the acceptable chance of cost overrun is 50%, 65% of the test projects would have required only 4% uplift of the contract sum to produce accurate forecasts of the final costs. If, on the other hand, the acceptable chance of cost overrun is only 10%, 5% of the test projects needed to use a 44% uplift to enable more accurate final project cost forecasts for the contractor. Additionally, to check the accuracy of the test data results obtained through applicable optimism bias uplift values, three standard error measures—root-mean-square error (RMSE), mean absolute error (MAE), and mean absolute percentage error (MAPE)—are used.
    • Download: (329.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Application of Reference Class Forecasting in Turkish Public Construction Projects: Contractor Perspective

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/82353
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorSavas Bayram
    contributor authorSaad Al-Jibouri
    date accessioned2017-05-08T22:32:41Z
    date available2017-05-08T22:32:41Z
    date copyrightMay 2016
    date issued2016
    identifier other49070865.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/82353
    description abstractCost overrun in construction projects is an important problem that can have serious financial consequences. It also reduces the effectiveness of planning and decision making not only for the contractor but for all parties involved. The problem keeps occurring despite many attempts made over the years to improve cost estimation and forecasting methods. This paper focuses on analyzing cost overruns in Turkey and comparing the cost estimates produced using the traditional estimating method against cost forecasts produced using the reference class forecasting (RCF) method. RCF is used to predict the final cost of a project predicated on actual cost outcomes of accomplished similar projects in the same reference class. RCF has been so far used to address estimation bias in early project development before design is completed and before all risks are accounted for to help a client to produce a more realistic forecast of the final project cost. In this paper, however, it is used to produce a forecast of the final project cost based on the contract sum. The work described in the paper involves collection of contract sum and final project cost data from 420 completed building projects. In order to test the ability of RCF to produce realistic forecasts of projects’ final costs, 75% of the data are used to produce the cost overruns distribution and to determine the required optimism bias uplift values for the building projects, while the other 25% of the data are used for testing the accuracy of the forecasts produced for the final costs of projects in the established reference class. The results have indicated that the required uplift values are in the range of 4 to 44%. For instance, if the acceptable chance of cost overrun is 50%, 65% of the test projects would have required only 4% uplift of the contract sum to produce accurate forecasts of the final costs. If, on the other hand, the acceptable chance of cost overrun is only 10%, 5% of the test projects needed to use a 44% uplift to enable more accurate final project cost forecasts for the contractor. Additionally, to check the accuracy of the test data results obtained through applicable optimism bias uplift values, three standard error measures—root-mean-square error (RMSE), mean absolute error (MAE), and mean absolute percentage error (MAPE)—are used.
    publisherAmerican Society of Civil Engineers
    titleApplication of Reference Class Forecasting in Turkish Public Construction Projects: Contractor Perspective
    typeJournal Paper
    journal volume32
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000421
    treeJournal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian