YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimizing Contractor Selection for Construction Packages in Capital Projects

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 005
    Author:
    Mahdi Safa
    ,
    Ming-Ho Yee
    ,
    Derek Rayside
    ,
    Carl T. Haas
    DOI: 10.1061/(ASCE)CP.1943-5487.0000555
    Publisher: American Society of Civil Engineers
    Abstract: In capital construction projects, the contractor selection process is executed in the front-end planning phase based on the experience and judgment of the project leadership team, whose members are considered experts. A comprehensive construction value packaging system (CVPS) is presented for assisting these project leaders in improving the efficacy, efficiency, and transparency of this process. The CVPS comprises an interface-oriented approach to work decomposition and a multicriteria approach to contractor selection. Selection is supported by software for iteratively computing and interactively visualizing the Pareto front of optimal work packages. The CVPS is validated by functional demonstration and a case study of a piping installation project in an energy infrastructure facility. The initial Pareto front had more than 100,000 optimal work packages representing different trade-offs between cost, time, contractor experience, maintenance rates, and financial stability. An iterative and interactive process of query formulation and exact (not heuristic) evaluation helped the expert to focus in on solutions of interest and created a transparent and quantitative record of the decision-making process. Thus, this research contributes a new paradigm and computational tool for project decision support.
    • Download: (2.099Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimizing Contractor Selection for Construction Packages in Capital Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/82166
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorMahdi Safa
    contributor authorMing-Ho Yee
    contributor authorDerek Rayside
    contributor authorCarl T. Haas
    date accessioned2017-05-08T22:32:04Z
    date available2017-05-08T22:32:04Z
    date copyrightSeptember 2016
    date issued2016
    identifier other48750561.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/82166
    description abstractIn capital construction projects, the contractor selection process is executed in the front-end planning phase based on the experience and judgment of the project leadership team, whose members are considered experts. A comprehensive construction value packaging system (CVPS) is presented for assisting these project leaders in improving the efficacy, efficiency, and transparency of this process. The CVPS comprises an interface-oriented approach to work decomposition and a multicriteria approach to contractor selection. Selection is supported by software for iteratively computing and interactively visualizing the Pareto front of optimal work packages. The CVPS is validated by functional demonstration and a case study of a piping installation project in an energy infrastructure facility. The initial Pareto front had more than 100,000 optimal work packages representing different trade-offs between cost, time, contractor experience, maintenance rates, and financial stability. An iterative and interactive process of query formulation and exact (not heuristic) evaluation helped the expert to focus in on solutions of interest and created a transparent and quantitative record of the decision-making process. Thus, this research contributes a new paradigm and computational tool for project decision support.
    publisherAmerican Society of Civil Engineers
    titleOptimizing Contractor Selection for Construction Packages in Capital Projects
    typeJournal Paper
    journal volume30
    journal issue5
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000555
    treeJournal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian