YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Global Total Cost Claims within Common Law Legal Systems: Application to the World Bank Contract

    Source: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2015:;Volume ( 007 ):;issue: 002
    Author:
    Salwa A. Fawzy
    ,
    Islam H. El-adaway
    DOI: 10.1061/(ASCE)LA.1943-4170.0000155
    Publisher: American Society of Civil Engineers
    Abstract: For a contractor to recover losses caused by events for which the employer is responsible, the contractor needs to (1) demonstrate that there are events for which the employer is responsible; (2) prove that the contractor has suffered loss; and (3) prove there is a causal link between the events and the losses sought to be recovered. However, sometimes it is impractical or impossible for the contractor to attribute specific losses or delays to specific breaches or events. In such cases, sometimes contractors submit the claim on a global basis. In a global claim (or total cost claim), the contractor does not adduce evidence to prove a causal link between its losses and the events for which the employer is responsible. Rather than prove the causal link, the contractor submits a collection of events and a total amount of loss incurred and argues that the events in their totality caused the loss. In this paper, the authors explained the global claim principle within the context of common law legal systems, and the requirements for a successful claim based on such principle are, as well, identified. The authors then (1) discussed the provisions related to delays, extension of time, and claims under the World Bank Conditions of Contract (WB Contract); (2) discussed the application of global claims under the WB Contract; (3) recommended appropriate contract administration guidelines for successful global claims under the WB Contract; and (4) identified the strategies employers may deploy to refute global claims submitted by contractors. This paper connected available literature and case law to help contractors submit successful global claims under the WB Contract and equally help employers identify the strategies that may be deployed to attack global claims submitted by contractors. This should support effective and efficient management of claims in construction projects operating under the WB Contracts.
    • Download: (95.34Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Global Total Cost Claims within Common Law Legal Systems: Application to the World Bank Contract

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/82036
    Collections
    • Journal of Legal Affairs and Dispute Resolution in Engineering and Construction

    Show full item record

    contributor authorSalwa A. Fawzy
    contributor authorIslam H. El-adaway
    date accessioned2017-05-08T22:31:34Z
    date available2017-05-08T22:31:34Z
    date copyrightMay 2015
    date issued2015
    identifier other48437460.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/82036
    description abstractFor a contractor to recover losses caused by events for which the employer is responsible, the contractor needs to (1) demonstrate that there are events for which the employer is responsible; (2) prove that the contractor has suffered loss; and (3) prove there is a causal link between the events and the losses sought to be recovered. However, sometimes it is impractical or impossible for the contractor to attribute specific losses or delays to specific breaches or events. In such cases, sometimes contractors submit the claim on a global basis. In a global claim (or total cost claim), the contractor does not adduce evidence to prove a causal link between its losses and the events for which the employer is responsible. Rather than prove the causal link, the contractor submits a collection of events and a total amount of loss incurred and argues that the events in their totality caused the loss. In this paper, the authors explained the global claim principle within the context of common law legal systems, and the requirements for a successful claim based on such principle are, as well, identified. The authors then (1) discussed the provisions related to delays, extension of time, and claims under the World Bank Conditions of Contract (WB Contract); (2) discussed the application of global claims under the WB Contract; (3) recommended appropriate contract administration guidelines for successful global claims under the WB Contract; and (4) identified the strategies employers may deploy to refute global claims submitted by contractors. This paper connected available literature and case law to help contractors submit successful global claims under the WB Contract and equally help employers identify the strategies that may be deployed to attack global claims submitted by contractors. This should support effective and efficient management of claims in construction projects operating under the WB Contracts.
    publisherAmerican Society of Civil Engineers
    titleGlobal Total Cost Claims within Common Law Legal Systems: Application to the World Bank Contract
    typeJournal Paper
    journal volume7
    journal issue2
    journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
    identifier doi10.1061/(ASCE)LA.1943-4170.0000155
    treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2015:;Volume ( 007 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian