| contributor author | Fengfeng Li | |
| contributor author | Lin Ma | |
| contributor author | Yong Sun | |
| contributor author | Joseph Mathew | |
| date accessioned | 2017-05-08T22:31:10Z | |
| date available | 2017-05-08T22:31:10Z | |
| date copyright | January 2016 | |
| date issued | 2016 | |
| identifier other | 48040072.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/81938 | |
| description abstract | Replacement of deteriorated water pipes is a capital-intensive activity for utility companies. Replacement planning aims to minimize total costs while maintaining a satisfactory level of service and is usually conducted for individual pipes. Scheduling replacement in groups is seen to be a better method and has the potential to provide benefits such as the reduction of maintenance costs and service interruptions. However, developing group replacement schedules is a complex task and often beyond the ability of a human expert, especially when multiple or conflicting objectives need to be catered for, such as minimization of total costs and service interruptions. This paper describes the development of a novel replacement decision optimization model for group scheduling (RDOM-GS), which enables multiple group-scheduling criteria by integrating new cost functions, a service interruption model, and optimization algorithms into a unified procedure. An industry case study demonstrates that RDOM-GS can improve replacement planning significantly and reduce costs and service interruptions. | |
| publisher | American Society of Civil Engineers | |
| title | Optimized Group Replacement Scheduling for Water Pipeline Network | |
| type | Journal Paper | |
| journal volume | 142 | |
| journal issue | 1 | |
| journal title | Journal of Water Resources Planning and Management | |
| identifier doi | 10.1061/(ASCE)WR.1943-5452.0000559 | |
| tree | Journal of Water Resources Planning and Management:;2016:;Volume ( 142 ):;issue: 001 | |
| contenttype | Fulltext | |