YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Time Is Money: Innovative Contracting Methods in Highway Construction

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 003
    Author:
    Zohar J. Herbsman
    ,
    Wei Tong Chen
    ,
    William C. Epstein
    DOI: 10.1061/(ASCE)0733-9364(1995)121:3(273)
    Publisher: American Society of Civil Engineers
    Abstract: In today's highway construction industry, the focus has shifted from building new transportation facilities to resurfacing, rehabilitating and restoring (3R's) those already in existence. These types of projects create a serious disruption in the normal flow of traffic resulting in a major inconvenience to the traveling public. Reducing construction time, thereby mitigating this inconvenience, has become a major emphasis for state highway agencies throughout the United States. In the past few years, several innovative contracting methods have been introduced into the highway construction industry. The basic concept of these innovative techniques is the motivation they provide encouraging the contractor to work faster, schedule accurately, and manage the construction process better. Results from the research conducted by the writers indicate that recent transportation projects constructed utilizing these innovative contracting methods have been very successful in reducing construction time, while only increasing overall construction costs minimally, if at all. This paper examines the advantages and disadvantages of these methods analyzing data obtained from various case studies throughout the United States and abroad.
    • Download: (1.161Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Time Is Money: Innovative Contracting Methods in Highway Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/81397
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorZohar J. Herbsman
    contributor authorWei Tong Chen
    contributor authorWilliam C. Epstein
    date accessioned2017-05-08T22:29:11Z
    date available2017-05-08T22:29:11Z
    date copyrightSeptember 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A3%28273%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/81397
    description abstractIn today's highway construction industry, the focus has shifted from building new transportation facilities to resurfacing, rehabilitating and restoring (3R's) those already in existence. These types of projects create a serious disruption in the normal flow of traffic resulting in a major inconvenience to the traveling public. Reducing construction time, thereby mitigating this inconvenience, has become a major emphasis for state highway agencies throughout the United States. In the past few years, several innovative contracting methods have been introduced into the highway construction industry. The basic concept of these innovative techniques is the motivation they provide encouraging the contractor to work faster, schedule accurately, and manage the construction process better. Results from the research conducted by the writers indicate that recent transportation projects constructed utilizing these innovative contracting methods have been very successful in reducing construction time, while only increasing overall construction costs minimally, if at all. This paper examines the advantages and disadvantages of these methods analyzing data obtained from various case studies throughout the United States and abroad.
    publisherAmerican Society of Civil Engineers
    titleTime Is Money: Innovative Contracting Methods in Highway Construction
    typeJournal Paper
    journal volume121
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:3(273)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian