YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Bidding and the Winner’s Curse: Game Theory Approach

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    Author:
    Muaz O. Ahmed
    ,
    Islam H. El-adaway
    ,
    Kalyn T. Coatney
    ,
    Mohamed S. Eid
    DOI: 10.1061/(ASCE)CO.1943-7862.0001058
    Publisher: American Society of Civil Engineers
    Abstract: In the construction industry, competitive bidding has long been used as a method for contractor selection. Because the true cost of construction is not known until the completion of the project, adverse selection is a major concern. Adverse selection is when the winner of the contract has underestimated the project’s true cost. Thus, the winning contractor will most likely earn negative or at least below normal profits. The winner’s curse is when the winning bidder submits an underestimated bid and is thus cursed by being selected to undertake the project. In the multistage bidding environment, where subcontractors are hired by a general contractor, the winner’s curse may be compounded. In general, contractors suffer from the winner’s curse for a variety of reasons including inaccurate estimates of project cost; new contractors entering the construction market; minimizing losses in case of recession of the construction industry; strong competition within the construction market; differential opportunity costs, which can affect the behavior of contractors; and the intention to win the project and then remedy the losses through change orders, claims, and other mechanisms. Using a game theory approach, this paper aims to analyze—and potentially reduce—industry exposure to the effects of the winner’s curse in construction bidding. To this end, the authors identify the degree of the winner’s curse in two common construction bidding environments; namely, single-stage bidding and multistage bidding. The objective is to compare the aforementioned two construction bidding environments and determine how learning from past bidding decisions and experiences can mitigate the winner’s curse. To this end, and through defining the relationship between the construction bidding and auction theory, the authors utilized a three-step research methodology that involved (1) presenting the symmetric risk neutral Nash equilibrium (SRNNE) as an optimal bid function; (2) developing simulation models for single and multistage construction bidding processes; and (3) analyzing the results of the simulation models, which is based on an actual dataset of projects provided by the California Department of Transportation. This research demonstrated that the majority of general contractors and subcontractors suffer from the winner’s curse in both single-stage and multistage bidding environments. Moreover, from a winner’s curse perspective, the multistage bidding environment incurs more losses than the single-stage bidding environment. However, through learning from past experiences, the multistage bidding environment provides contractors with a better opportunity to avoid the winner’s curse if compared with the single-stage bidding environment. This research should be beneficial for the profession to better understand the bidding decision-making processes. For future work, cooperative game theory can be applied with the integrated project delivery principles to help all associated parties mutually achieve their project objectives.
    • Download: (823.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Bidding and the Winner’s Curse: Game Theory Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/81121
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMuaz O. Ahmed
    contributor authorIslam H. El-adaway
    contributor authorKalyn T. Coatney
    contributor authorMohamed S. Eid
    date accessioned2017-05-08T22:28:10Z
    date available2017-05-08T22:28:10Z
    date copyrightFebruary 2016
    date issued2016
    identifier other45895146.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/81121
    description abstractIn the construction industry, competitive bidding has long been used as a method for contractor selection. Because the true cost of construction is not known until the completion of the project, adverse selection is a major concern. Adverse selection is when the winner of the contract has underestimated the project’s true cost. Thus, the winning contractor will most likely earn negative or at least below normal profits. The winner’s curse is when the winning bidder submits an underestimated bid and is thus cursed by being selected to undertake the project. In the multistage bidding environment, where subcontractors are hired by a general contractor, the winner’s curse may be compounded. In general, contractors suffer from the winner’s curse for a variety of reasons including inaccurate estimates of project cost; new contractors entering the construction market; minimizing losses in case of recession of the construction industry; strong competition within the construction market; differential opportunity costs, which can affect the behavior of contractors; and the intention to win the project and then remedy the losses through change orders, claims, and other mechanisms. Using a game theory approach, this paper aims to analyze—and potentially reduce—industry exposure to the effects of the winner’s curse in construction bidding. To this end, the authors identify the degree of the winner’s curse in two common construction bidding environments; namely, single-stage bidding and multistage bidding. The objective is to compare the aforementioned two construction bidding environments and determine how learning from past bidding decisions and experiences can mitigate the winner’s curse. To this end, and through defining the relationship between the construction bidding and auction theory, the authors utilized a three-step research methodology that involved (1) presenting the symmetric risk neutral Nash equilibrium (SRNNE) as an optimal bid function; (2) developing simulation models for single and multistage construction bidding processes; and (3) analyzing the results of the simulation models, which is based on an actual dataset of projects provided by the California Department of Transportation. This research demonstrated that the majority of general contractors and subcontractors suffer from the winner’s curse in both single-stage and multistage bidding environments. Moreover, from a winner’s curse perspective, the multistage bidding environment incurs more losses than the single-stage bidding environment. However, through learning from past experiences, the multistage bidding environment provides contractors with a better opportunity to avoid the winner’s curse if compared with the single-stage bidding environment. This research should be beneficial for the profession to better understand the bidding decision-making processes. For future work, cooperative game theory can be applied with the integrated project delivery principles to help all associated parties mutually achieve their project objectives.
    publisherAmerican Society of Civil Engineers
    titleConstruction Bidding and the Winner’s Curse: Game Theory Approach
    typeJournal Paper
    journal volume142
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001058
    treeJournal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian