contributor author | Juan Chen | |
contributor author | Ping-an Zhong | |
contributor author | Bin Xu | |
contributor author | Yun-fa Zhao | |
date accessioned | 2017-05-08T22:25:13Z | |
date available | 2017-05-08T22:25:13Z | |
date copyright | August 2015 | |
date issued | 2015 | |
identifier other | 44341449.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/80302 | |
description abstract | There are many uncertainties in real-time flood control operation of a reservoir, which create risks in flood control decision making. In this paper, three uncertainty factors—reservoir inflow-forecasting errors, outflow errors, and observation errors of reservoir storage capacity curve—are taken into account and quantified methods are proposed. With consideration of the three uncertainties and correlation between inflow-forecasting errors, reservoir water-level errors are derived using the stochastic differential equation of reservoir flood routing. Then the definition and calculation methods for flood risk at each moment and the integrated risk of the entire flood process are proposed. The Dahuofang reservoir in China is selected as the case study. The results shows that the risk resulting from the uncertainties is decreased by the reservoir flood regulation function and that the proposed method can provide a useful way to estimate the risks in real-time reservoir flood control. | |
publisher | American Society of Civil Engineers | |
title | Risk Analysis for Real-Time Flood Control Operation of a Reservoir | |
type | Journal Paper | |
journal volume | 141 | |
journal issue | 8 | |
journal title | Journal of Water Resources Planning and Management | |
identifier doi | 10.1061/(ASCE)WR.1943-5452.0000490 | |
tree | Journal of Water Resources Planning and Management:;2015:;Volume ( 141 ):;issue: 008 | |
contenttype | Fulltext | |