YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risks and Guarantees in BOT Tender

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 002
    Author:
    Robert L. K. Tiong
    DOI: 10.1061/(ASCE)0733-9364(1995)121:2(183)
    Publisher: American Society of Civil Engineers
    Abstract: The build-operate-transfer (BOT) concept is being used increasingly by governments across a number of infrastructural sectors in their drive to privatize major public projects. Governments see BOT schemes as a method of financing the construction of urgently needed infrastructure projects without direct sovereign guarantee of the loans and with all the technical and financial risks being borne by the private promoter. This paper is concerned with the issues of risks to be retained by the promoter and the guarantees to be offered to the government in the selection process of a BOT tender. It is critical for the promoter to understand that the ability to retain risks and offer guarantees does provide the competitive advantage in being awarded the concession.
    • Download: (851.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risks and Guarantees in BOT Tender

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/79952
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRobert L. K. Tiong
    date accessioned2017-05-08T22:24:30Z
    date available2017-05-08T22:24:30Z
    date copyrightJune 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A2%28183%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/79952
    description abstractThe build-operate-transfer (BOT) concept is being used increasingly by governments across a number of infrastructural sectors in their drive to privatize major public projects. Governments see BOT schemes as a method of financing the construction of urgently needed infrastructure projects without direct sovereign guarantee of the loans and with all the technical and financial risks being borne by the private promoter. This paper is concerned with the issues of risks to be retained by the promoter and the guarantees to be offered to the government in the selection process of a BOT tender. It is critical for the promoter to understand that the ability to retain risks and offer guarantees does provide the competitive advantage in being awarded the concession.
    publisherAmerican Society of Civil Engineers
    titleRisks and Guarantees in BOT Tender
    typeJournal Paper
    journal volume121
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:2(183)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian