YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Impact of I/D Contracts Used for Expediting Michigan’s Road Construction

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 007
    Author:
    Mohamed El-Gafy
    ,
    Tariq Abdelhamid
    DOI: 10.1061/(ASCE)CO.1943-7862.0000977
    Publisher: American Society of Civil Engineers
    Abstract: The Michigan DOT (MDOT) has been using monetary incentive/disincentive (I/D) payments/penalties to accelerate highway construction work. This paper examines whether the I/D for expediting construction captures the true cost (user delay savings versus actual I/D dollars) and identifies its impacts on the long-term pavement performance for projects that have been expedited. Data were collected and analyzed on projects built through acceleration techniques and similar projects, constructed under standard contract means from 1998 to 2012. The analyzed data statistically supports an improvement in the long-term project performance for incentive projects and suggests a trend that incentive clauses accelerate project schedules. Additionally, data analysis statistically supports the concept that incentive clauses increase project cost yet further analysis finds that the avoided user delay was higher than the additional paid cost for some incentive clauses. The analysis results highlight the effectiveness of accepted for traffic and interim completion incentive/disincentive clauses; they also debate the effectiveness of the lane rental incentive/disincentive clauses, in accelerating project schedules, and reducing user delay cost for MDOT. In summary, the explicit contribution to the body of knowledge that this paper claims is to propose a research procedure that could be used to examine the impact of I/D contracts for expediting road construction work. Additionally, the paper sheds some lights on Michigan I/D practices and their impact that could motivate other practitioners to evaluate their own I/D practices.
    • Download: (677.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Impact of I/D Contracts Used for Expediting Michigan’s Road Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/79450
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMohamed El-Gafy
    contributor authorTariq Abdelhamid
    date accessioned2017-05-08T22:23:31Z
    date available2017-05-08T22:23:31Z
    date copyrightJuly 2015
    date issued2015
    identifier other43930018.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/79450
    description abstractThe Michigan DOT (MDOT) has been using monetary incentive/disincentive (I/D) payments/penalties to accelerate highway construction work. This paper examines whether the I/D for expediting construction captures the true cost (user delay savings versus actual I/D dollars) and identifies its impacts on the long-term pavement performance for projects that have been expedited. Data were collected and analyzed on projects built through acceleration techniques and similar projects, constructed under standard contract means from 1998 to 2012. The analyzed data statistically supports an improvement in the long-term project performance for incentive projects and suggests a trend that incentive clauses accelerate project schedules. Additionally, data analysis statistically supports the concept that incentive clauses increase project cost yet further analysis finds that the avoided user delay was higher than the additional paid cost for some incentive clauses. The analysis results highlight the effectiveness of accepted for traffic and interim completion incentive/disincentive clauses; they also debate the effectiveness of the lane rental incentive/disincentive clauses, in accelerating project schedules, and reducing user delay cost for MDOT. In summary, the explicit contribution to the body of knowledge that this paper claims is to propose a research procedure that could be used to examine the impact of I/D contracts for expediting road construction work. Additionally, the paper sheds some lights on Michigan I/D practices and their impact that could motivate other practitioners to evaluate their own I/D practices.
    publisherAmerican Society of Civil Engineers
    titleImpact of I/D Contracts Used for Expediting Michigan’s Road Construction
    typeJournal Paper
    journal volume141
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000977
    treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian