YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Productivity Improvement of Sewer CCTV Inspection through Time Study and Route Optimization

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 006
    Author:
    Reza Navab-Kashani
    ,
    Leon F. Gay
    ,
    Alireza Bayat
    DOI: 10.1061/(ASCE)CO.1943-7862.0000976
    Publisher: American Society of Civil Engineers
    Abstract: Closed-circuit television (CCTV) is the most widely used visual inspection method for sewers. Given the amount of public money spent on these inspections in Canada annually, productivity improvements may represent significant financial savings to the public. This paper presents a study based on several sewer mainline CCTV surveys in Edmonton, Alberta, Canada. The overall objective is to enhance sewer CCTV inspection production rate through the duration reduction of non-value added activities. The methodology includes performing a work measurement study and using a travel route optimization algorithm. The first section of the paper presents the results of the work measurement study conducted on 214 CCTV operations, as well as the calculated time allotment for each work component in the process. In the second section, an optimization technique is applied to CCTV truck movements considering the two traveling path types of road distance (actual distance traveled) and linear distance (straight distance between two points on a map) distances used to find an optimal route. As traveling to target manholes and locating those manholes are identified in the first section of the paper as the most time-consuming, non-value added activities in CCTV operations, this study investigates the application of the traveling salesman problem (TSP) as a traveling path optimization technique for daily CCTV inspections. Through the analysis of the effect of actual road distances on the CCTV inspection cycle time, this study shows that the application of a TSP solver for preplanning traveling paths can improve the inspection production rate of both daily CCTV activities and the CCTV inspection of entire neighborhoods by about 13%.
    • Download: (7.131Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Productivity Improvement of Sewer CCTV Inspection through Time Study and Route Optimization

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/79297
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorReza Navab-Kashani
    contributor authorLeon F. Gay
    contributor authorAlireza Bayat
    date accessioned2017-05-08T22:23:15Z
    date available2017-05-08T22:23:15Z
    date copyrightJune 2015
    date issued2015
    identifier other43885488.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/79297
    description abstractClosed-circuit television (CCTV) is the most widely used visual inspection method for sewers. Given the amount of public money spent on these inspections in Canada annually, productivity improvements may represent significant financial savings to the public. This paper presents a study based on several sewer mainline CCTV surveys in Edmonton, Alberta, Canada. The overall objective is to enhance sewer CCTV inspection production rate through the duration reduction of non-value added activities. The methodology includes performing a work measurement study and using a travel route optimization algorithm. The first section of the paper presents the results of the work measurement study conducted on 214 CCTV operations, as well as the calculated time allotment for each work component in the process. In the second section, an optimization technique is applied to CCTV truck movements considering the two traveling path types of road distance (actual distance traveled) and linear distance (straight distance between two points on a map) distances used to find an optimal route. As traveling to target manholes and locating those manholes are identified in the first section of the paper as the most time-consuming, non-value added activities in CCTV operations, this study investigates the application of the traveling salesman problem (TSP) as a traveling path optimization technique for daily CCTV inspections. Through the analysis of the effect of actual road distances on the CCTV inspection cycle time, this study shows that the application of a TSP solver for preplanning traveling paths can improve the inspection production rate of both daily CCTV activities and the CCTV inspection of entire neighborhoods by about 13%.
    publisherAmerican Society of Civil Engineers
    titleProductivity Improvement of Sewer CCTV Inspection through Time Study and Route Optimization
    typeJournal Paper
    journal volume141
    journal issue6
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000976
    treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian