YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Predesign Cost Estimating Method for Multistory Buildings

    Source: Journal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 001
    Author:
    Saeed Karshenas
    DOI: 10.1061/(ASCE)0733-9364(1984)110:1(79)
    Publisher: American Society of Civil Engineers
    Abstract: Historical building costs are used to derive the mathematical relationship among the cost, height, and typical floor area of multistory office buildings. The method of least squares is used to select the functional form of the cost equation. The results of the derived model are compared with the cost book estimates.
    • Download: (433.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Predesign Cost Estimating Method for Multistory Buildings

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/79063
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorSaeed Karshenas
    date accessioned2017-05-08T22:22:39Z
    date available2017-05-08T22:22:39Z
    date copyrightMarch 1984
    date issued1984
    identifier other%28asce%290733-9364%281984%29110%3A1%2879%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/79063
    description abstractHistorical building costs are used to derive the mathematical relationship among the cost, height, and typical floor area of multistory office buildings. The method of least squares is used to select the functional form of the cost equation. The results of the derived model are compared with the cost book estimates.
    publisherAmerican Society of Civil Engineers
    titlePredesign Cost Estimating Method for Multistory Buildings
    typeJournal Paper
    journal volume110
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1984)110:1(79)
    treeJournal of Construction Engineering and Management:;1984:;Volume ( 110 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian