YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk-Based Project Delivery Selection Model for Highway Design and Construction

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 012
    Author:
    Dai Q. Tran
    ,
    Keith R. Molenaar
    DOI: 10.1061/(ASCE)CO.1943-7862.0001024
    Publisher: American Society of Civil Engineers
    Abstract: Project-delivery methods allocate risk for design and construction between contractual parties. State departments of transportation (DOTs) using federal funds employ three primary project-delivery methods: (1) design-bid-build (D-B-B); (2) design-build (D-B); and (3) construction manager/general contractor (CM/GC). Because the choice of a project-delivery method is best made early in the project-development process, it is a complex decision that is fraught with risk and uncertainty. This paper presents a risk-based modeling methodology to evaluate and quantify the potential differences in project cost attributable to the selection of a project-delivery method. The risk-based model consists of (1) an input structure of assessment and evaluation of delivery-risk factors; (2) a computational-modeling structure for calculating costs; and (3) an output structure to communicate model results and implementation. The assessment and evaluation process determines the risks that are incorporated into the delivery decision. It translates static cost and schedule uncertainty from project specifics to input variables (risk factors) and to decision variables (project outcomes). The computational model employs crossimpact analysis techniques and probabilistic inferences to capture uncertainties and interactions among the input and decision variables. The model result provides three approximate cost distributions associated with three project-delivery methods (D-B, D-B-B, and CM/GC) and a sensitivity result (i.e., tornado diagrams) that describes which risk factors have the most significant impact on these costs. The model was successfully tested on three highway projects which are discussed in detail in this paper. The findings from this paper add to the existing body of knowledge by providing a novel method to predict project costs based upon the owner’s choice of alternative project-delivery methods. The approach combines multivariate analysis with crossimpact analysis to make the predictions and provide a sensitivity analysis for project risks. The findings also provide a systematic approach to quantitatively selecting an appropriate delivery method that encourages highway agencies to conduct risk analysis early in the project-development process.
    • Download: (1000.Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk-Based Project Delivery Selection Model for Highway Design and Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/78979
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDai Q. Tran
    contributor authorKeith R. Molenaar
    date accessioned2017-05-08T22:22:27Z
    date available2017-05-08T22:22:27Z
    date copyrightDecember 2015
    date issued2015
    identifier other43575533.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78979
    description abstractProject-delivery methods allocate risk for design and construction between contractual parties. State departments of transportation (DOTs) using federal funds employ three primary project-delivery methods: (1) design-bid-build (D-B-B); (2) design-build (D-B); and (3) construction manager/general contractor (CM/GC). Because the choice of a project-delivery method is best made early in the project-development process, it is a complex decision that is fraught with risk and uncertainty. This paper presents a risk-based modeling methodology to evaluate and quantify the potential differences in project cost attributable to the selection of a project-delivery method. The risk-based model consists of (1) an input structure of assessment and evaluation of delivery-risk factors; (2) a computational-modeling structure for calculating costs; and (3) an output structure to communicate model results and implementation. The assessment and evaluation process determines the risks that are incorporated into the delivery decision. It translates static cost and schedule uncertainty from project specifics to input variables (risk factors) and to decision variables (project outcomes). The computational model employs crossimpact analysis techniques and probabilistic inferences to capture uncertainties and interactions among the input and decision variables. The model result provides three approximate cost distributions associated with three project-delivery methods (D-B, D-B-B, and CM/GC) and a sensitivity result (i.e., tornado diagrams) that describes which risk factors have the most significant impact on these costs. The model was successfully tested on three highway projects which are discussed in detail in this paper. The findings from this paper add to the existing body of knowledge by providing a novel method to predict project costs based upon the owner’s choice of alternative project-delivery methods. The approach combines multivariate analysis with crossimpact analysis to make the predictions and provide a sensitivity analysis for project risks. The findings also provide a systematic approach to quantitatively selecting an appropriate delivery method that encourages highway agencies to conduct risk analysis early in the project-development process.
    publisherAmerican Society of Civil Engineers
    titleRisk-Based Project Delivery Selection Model for Highway Design and Construction
    typeJournal Paper
    journal volume141
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001024
    treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian