YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Effects of Delay Times on Production Rates in Construction

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    Author:
    John Christian
    ,
    Daniel Hachey
    DOI: 10.1061/(ASCE)0733-9364(1995)121:1(20)
    Publisher: American Society of Civil Engineers
    Abstract: Factors that can be fairly easily identified and modified and can lead to significant improvements in production rates for activities in construction are considered in this paper. These factors are divided into four work categories. Two of the four work categories in which each construction activity was subdivided were idle and waiting times. Productivity measurements generally do not distinguish between the idle and waiting times. Conclusions can therefore be misleading, and more importantly, the attention of management is only vaguely and imprecisely directed to the cause of the inefficiencies. The breakdown of nonproductive time into two factors is therefore very important in directing the attention of management to the root causes of inefficient time. The variation in production rates used by contractors' estimators are given and compared with actual on-site production rates. The frequency of different sources of information used by contractors when estimating production rates, and the percentage use of production monitoring methods, are also given. A prototype expert system, using the Personal Consultant Plus shell program of 1987, was developed to assist in the acquisition and management of knowledge and data for the estimation of production rates.
    • Download: (680.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Effects of Delay Times on Production Rates in Construction

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/78730
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJohn Christian
    contributor authorDaniel Hachey
    date accessioned2017-05-08T22:21:50Z
    date available2017-05-08T22:21:50Z
    date copyrightMarch 1995
    date issued1995
    identifier other%28asce%290733-9364%281995%29121%3A1%2820%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78730
    description abstractFactors that can be fairly easily identified and modified and can lead to significant improvements in production rates for activities in construction are considered in this paper. These factors are divided into four work categories. Two of the four work categories in which each construction activity was subdivided were idle and waiting times. Productivity measurements generally do not distinguish between the idle and waiting times. Conclusions can therefore be misleading, and more importantly, the attention of management is only vaguely and imprecisely directed to the cause of the inefficiencies. The breakdown of nonproductive time into two factors is therefore very important in directing the attention of management to the root causes of inefficient time. The variation in production rates used by contractors' estimators are given and compared with actual on-site production rates. The frequency of different sources of information used by contractors when estimating production rates, and the percentage use of production monitoring methods, are also given. A prototype expert system, using the Personal Consultant Plus shell program of 1987, was developed to assist in the acquisition and management of knowledge and data for the estimation of production rates.
    publisherAmerican Society of Civil Engineers
    titleEffects of Delay Times on Production Rates in Construction
    typeJournal Paper
    journal volume121
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1995)121:1(20)
    treeJournal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian