Show simple item record

contributor authorWilliam McGuire
date accessioned2017-05-08T22:21:05Z
date available2017-05-08T22:21:05Z
date copyrightMay 1992
date issued1992
identifier other42838668.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78405
description abstractThe writer is engaged by the Occupational Safety and Health Administration (OSHA) to study the National Bureau of Standards (NBS) report on the L'Ambiance Plaza Building collapse and develop supplemental information for its use in legal proceedings. The study includes a review of the design of the lifting collar/shearhead assemblages. The paper is a summary of that review and the, writer's interpretation of subsequent evidence. Copies of design calculations and contract drawings are studied. In the paper, the absence of consideration of the effect of the lifting conditions on stresses in the arm channels in these calculations is noted. Questionable design details for welds connecting lifting angles to arm channels and header bars to header channels are also noted. The faulty condition of some of these welds as shown by lifting collar sectioning is illustrated. Evidence presented after the negotiated settlement of November 1988 reinforces the writer's finding that any of these deficiencies, and particularly the combination of unwise welds poorly executed, could have resulted in the initiation of the collapse. Recommendations for further investigation of these deficiencies are presented.
publisherAmerican Society of Civil Engineers
titleComments on L'Ambiance Plaza Lifting Collar/Shearheads
typeJournal Paper
journal volume6
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)0887-3828(1992)6:2(78)
treeJournal of Performance of Constructed Facilities:;1992:;Volume ( 006 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record