YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Automated Lifting System Integrated with Construction Hoists for Table Formwork in Tall Buildings

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 010
    Author:
    Taehoon Kim
    ,
    Hyunsu Lim
    ,
    Hunhee Cho
    ,
    Kyung-In Kang
    DOI: 10.1061/(ASCE)CO.1943-7862.0000884
    Publisher: American Society of Civil Engineers
    Abstract: In tall-building construction, the equipment-driven table formwork method is a useful alternative for improving productivity of horizontal formwork with less skilled labor. The lifting system significantly affects the productivity and costs of table formwork operation. This study proposes a new system integrated with the construction hoists for automating the lifting process of table formwork. The system targets crane-independent transportation for productivity improvements while overcoming the limitations of the existing independent lifting system, which include high initial cost and extra work for assembly and operation. In a case study, the proposed system showed 49.4% improved productivity over a tower crane, and equipment costs were 73.8% lower than those of the existing independent system. The simplified structure of the system through integration with the hoist could minimize the additional time and cost inputs for its assembly and operation. The proposed system could provide more flexible and stable scheduling at a lower cost in tall-building construction with short cycle times and excessive lifting loads.
    • Download: (17.29Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Automated Lifting System Integrated with Construction Hoists for Table Formwork in Tall Buildings

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/78135
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorTaehoon Kim
    contributor authorHyunsu Lim
    contributor authorHunhee Cho
    contributor authorKyung-In Kang
    date accessioned2017-05-08T22:20:25Z
    date available2017-05-08T22:20:25Z
    date copyrightOctober 2014
    date issued2014
    identifier other42116481.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/78135
    description abstractIn tall-building construction, the equipment-driven table formwork method is a useful alternative for improving productivity of horizontal formwork with less skilled labor. The lifting system significantly affects the productivity and costs of table formwork operation. This study proposes a new system integrated with the construction hoists for automating the lifting process of table formwork. The system targets crane-independent transportation for productivity improvements while overcoming the limitations of the existing independent lifting system, which include high initial cost and extra work for assembly and operation. In a case study, the proposed system showed 49.4% improved productivity over a tower crane, and equipment costs were 73.8% lower than those of the existing independent system. The simplified structure of the system through integration with the hoist could minimize the additional time and cost inputs for its assembly and operation. The proposed system could provide more flexible and stable scheduling at a lower cost in tall-building construction with short cycle times and excessive lifting loads.
    publisherAmerican Society of Civil Engineers
    titleAutomated Lifting System Integrated with Construction Hoists for Table Formwork in Tall Buildings
    typeJournal Paper
    journal volume140
    journal issue10
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000884
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 010
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian