YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Transportation Engineering, Part A: Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk-Based Two-Step Optimization Model for Highway Transportation Investment Decision-Making

    Source: Journal of Transportation Engineering, Part A: Systems:;2014:;Volume ( 140 ):;issue: 005
    Author:
    Bei Zhou
    ,
    Zongzhi Li
    ,
    Harshingar Patel
    ,
    Arash M. Roshandeh
    ,
    Yuanqing Wang
    DOI: 10.1061/(ASCE)TE.1943-5436.0000652
    Publisher: American Society of Civil Engineers
    Abstract: A new methodology is introduced for project selection that explicitly addresses issues of achieving maximized overall project benefits by selecting a subcollection of candidate projects for possible implementation at a given budget level while controlling the total risk of the expected project benefits within an acceptable lower bound. The covariance value is utilized to denote the risk of the expected benefits of jointly implementing two projects, in which each project maintains a range of possible benefits and a probability distribution. The summation of all covariance values corresponding to all possible project implementation combinations represents the total risk of the expected benefits. The methodology contains two-step optimizations. First, the Markowitz mean-variance model is employed to establish the lower-bound risk of project benefits for a given budget level. Second, the conventionally accepted zero/one knapsack model for project selection is augmented to incorporate the lower-bound risk established from the first-step optimization as one additional chance constraint. In this way, the overall benefits of projects selected for implementation are maximized while controlling the total risk of the expected project benefits within a lower bound for a certain percentage of time. The proposed model is applied for a 6-year statewide interstate highway project selection and programming. Cross comparisons are made in the consistencies of project selection results generated from the basic knapsack model, proposed two-step enhanced knapsack model, and current state highway programming practice.
    • Download: (428.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk-Based Two-Step Optimization Model for Highway Transportation Investment Decision-Making

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/75792
    Collections
    • Journal of Transportation Engineering, Part A: Systems

    Show full item record

    contributor authorBei Zhou
    contributor authorZongzhi Li
    contributor authorHarshingar Patel
    contributor authorArash M. Roshandeh
    contributor authorYuanqing Wang
    date accessioned2017-05-08T22:16:22Z
    date available2017-05-08T22:16:22Z
    date copyrightMay 2014
    date issued2014
    identifier other40049808.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/75792
    description abstractA new methodology is introduced for project selection that explicitly addresses issues of achieving maximized overall project benefits by selecting a subcollection of candidate projects for possible implementation at a given budget level while controlling the total risk of the expected project benefits within an acceptable lower bound. The covariance value is utilized to denote the risk of the expected benefits of jointly implementing two projects, in which each project maintains a range of possible benefits and a probability distribution. The summation of all covariance values corresponding to all possible project implementation combinations represents the total risk of the expected benefits. The methodology contains two-step optimizations. First, the Markowitz mean-variance model is employed to establish the lower-bound risk of project benefits for a given budget level. Second, the conventionally accepted zero/one knapsack model for project selection is augmented to incorporate the lower-bound risk established from the first-step optimization as one additional chance constraint. In this way, the overall benefits of projects selected for implementation are maximized while controlling the total risk of the expected project benefits within a lower bound for a certain percentage of time. The proposed model is applied for a 6-year statewide interstate highway project selection and programming. Cross comparisons are made in the consistencies of project selection results generated from the basic knapsack model, proposed two-step enhanced knapsack model, and current state highway programming practice.
    publisherAmerican Society of Civil Engineers
    titleRisk-Based Two-Step Optimization Model for Highway Transportation Investment Decision-Making
    typeJournal Paper
    journal volume140
    journal issue5
    journal titleJournal of Transportation Engineering, Part A: Systems
    identifier doi10.1061/(ASCE)TE.1943-5436.0000652
    treeJournal of Transportation Engineering, Part A: Systems:;2014:;Volume ( 140 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian