| contributor author | Michael C. Vorster | |
| contributor author | Glenn A. Sears | |
| date accessioned | 2017-05-08T22:15:06Z | |
| date available | 2017-05-08T22:15:06Z | |
| date copyright | March 1987 | |
| date issued | 1987 | |
| identifier other | 39997001.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/75201 | |
| description abstract | Retirement and replacement models for construction equipment have been based on the notion that there is an optimum time to sell a piece of equipment to the competition. One problem with these models is that they do not explain why one's competition may have a need for the equipment when one does not. The model presented here looks at the consequential costs of downtime for each piece of equipment when assigned to specific applications. Old and unreliable equipment therefore carries a significant consequential downtime cost when used in a key production application. Likewise, new and reliable equipment carries a significant capital recovery cost, which makes it less desirable in applications where consequential costs of downtime are low. This model provides a methodology to assign equipment optimally and to identify equipment for which its owner typically has no good applications. | |
| publisher | American Society of Civil Engineers | |
| title | Model for Retiring, Replacing, or Reassigning construction equipment | |
| type | Journal Paper | |
| journal volume | 113 | |
| journal issue | 1 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(1987)113:1(125) | |
| tree | Journal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 001 | |
| contenttype | Fulltext | |