YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Infrastructure Systems
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cost of Right-of-Way Acquisition: Recognizing the Impact of Condemnation via a Switching Regression Model

    Source: Journal of Infrastructure Systems:;2014:;Volume ( 020 ):;issue: 004
    Author:
    Xiaoxia Xiong
    ,
    Kara Kockelman
    DOI: 10.1061/(ASCE)IS.1943-555X.0000195
    Publisher: American Society of Civil Engineers
    Abstract: The costs of acquiring parcels by condemnation are usually significantly higher than those of property acquired by negotiation, suggesting that right-of-way (R/W) acquisition costs may best be described by two different regression equations. This paper develops a switching regression model of acquisition cost to simultaneously predict the probability of whether a parcel will go to condemnation rather than be acquired through negotiation and the corresponding acquisition costs under these two regimes. The error terms of the selection equation and the two cost equations follow a trivariate normal distribution to reflect codependence on unobserved factors (such as a land owner’s tenacity or a site’s view value). When applied to the properties acquired across the state of Texas for transportation probjects between 2008 and 2011, the results of this switching regression model suggest that R/W appraisers and staff should pay special attention to parcels in commercial use involving a partial taking with a relatively small remainder and located in more urbanized areas. Comparison of cost estimates between the two regimes (condemnation versus negotiation) suggests that condemned parcels will have, on average, 78% higher acquisition costs and 51% greater price variation across the 1,710 acquired properties. These results suggest that it is much more costly to acquire a property and more difficult to accurately predict its costs if it cannot be acquired through negotiation. The application of model estimates to an example corridor highlights the value of simulation to capture all modeling uncertainties.
    • Download: (144.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Cost of Right-of-Way Acquisition: Recognizing the Impact of Condemnation via a Switching Regression Model

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/74664
    Collections
    • Journal of Infrastructure Systems

    Show full item record

    contributor authorXiaoxia Xiong
    contributor authorKara Kockelman
    date accessioned2017-05-08T22:14:12Z
    date available2017-05-08T22:14:12Z
    date copyrightDecember 2014
    date issued2014
    identifier other39940174.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/74664
    description abstractThe costs of acquiring parcels by condemnation are usually significantly higher than those of property acquired by negotiation, suggesting that right-of-way (R/W) acquisition costs may best be described by two different regression equations. This paper develops a switching regression model of acquisition cost to simultaneously predict the probability of whether a parcel will go to condemnation rather than be acquired through negotiation and the corresponding acquisition costs under these two regimes. The error terms of the selection equation and the two cost equations follow a trivariate normal distribution to reflect codependence on unobserved factors (such as a land owner’s tenacity or a site’s view value). When applied to the properties acquired across the state of Texas for transportation probjects between 2008 and 2011, the results of this switching regression model suggest that R/W appraisers and staff should pay special attention to parcels in commercial use involving a partial taking with a relatively small remainder and located in more urbanized areas. Comparison of cost estimates between the two regimes (condemnation versus negotiation) suggests that condemned parcels will have, on average, 78% higher acquisition costs and 51% greater price variation across the 1,710 acquired properties. These results suggest that it is much more costly to acquire a property and more difficult to accurately predict its costs if it cannot be acquired through negotiation. The application of model estimates to an example corridor highlights the value of simulation to capture all modeling uncertainties.
    publisherAmerican Society of Civil Engineers
    titleCost of Right-of-Way Acquisition: Recognizing the Impact of Condemnation via a Switching Regression Model
    typeJournal Paper
    journal volume20
    journal issue4
    journal titleJournal of Infrastructure Systems
    identifier doi10.1061/(ASCE)IS.1943-555X.0000195
    treeJournal of Infrastructure Systems:;2014:;Volume ( 020 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian