contributor author | Liang Chang | |
contributor author | Fan Peng | |
contributor author | Yanfeng Ouyang | |
contributor author | Amr S. Elnashai | |
contributor author | Billie F. Spencer Jr. | |
date accessioned | 2017-05-08T22:13:24Z | |
date available | 2017-05-08T22:13:24Z | |
date copyright | December 2013 | |
date issued | 2013 | |
identifier other | 39896189.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/74146 | |
publisher | American Society of Civil Engineers | |
title | Erratum for “Bridge Seismic Retrofit Program Planning to Maximize Postearthquake Transportation Network Capacity” by Liang Chang, Fan Peng, Yanfeng Ouyang, Amr S. Elnashai, and Billie F. Spencer Jr. | |
type | Journal Paper | |
journal volume | 19 | |
journal issue | 4 | |
journal title | Journal of Infrastructure Systems | |
identifier doi | 10.1061/(ASCE)IS.1943-555X.0000172 | |
tree | Journal of Infrastructure Systems:;2013:;Volume ( 019 ):;issue: 004 | |
contenttype | Fulltext | |