YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Two-Stage Scheduling Model for Resource Leveling of Linear Projects

    Source: Journal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 007
    Author:
    Yuanjie Tang
    ,
    Rengkui Liu
    ,
    Quanxin Sun
    DOI: 10.1061/(ASCE)CO.1943-7862.0000862
    Publisher: American Society of Civil Engineers
    Abstract: In recent times, linear project resource leveling based on the linear scheduling method (LSM) has attracted considerable interest owing to the unique advantages of applying the LSM to linear projects. In the research reported in this paper, the linear project resource leveling problem was described as a constraint satisfaction problem based on analyses conducted in previous studies and a two-stage scheduling model for resource leveling of linear projects based on the LSM was proposed. The optimization process was reasonably set so as to fully utilize the rate float of the activity to obtain a more optimal schedule. The constraint programming (CP) technique was used for solving this problem. Based on the proposed scheduling model and algorithm, a two-stage scheduling system for resource leveling of linear projects was developed for automatically establishing a linear schedule for resource leveling. The effectiveness of the proposed model and algorithm was verified for a highway construction project reported previously.
    • Download: (1.643Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Two-Stage Scheduling Model for Resource Leveling of Linear Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/73280
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYuanjie Tang
    contributor authorRengkui Liu
    contributor authorQuanxin Sun
    date accessioned2017-05-08T22:11:56Z
    date available2017-05-08T22:11:56Z
    date copyrightJuly 2014
    date issued2014
    identifier other39686740.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/73280
    description abstractIn recent times, linear project resource leveling based on the linear scheduling method (LSM) has attracted considerable interest owing to the unique advantages of applying the LSM to linear projects. In the research reported in this paper, the linear project resource leveling problem was described as a constraint satisfaction problem based on analyses conducted in previous studies and a two-stage scheduling model for resource leveling of linear projects based on the LSM was proposed. The optimization process was reasonably set so as to fully utilize the rate float of the activity to obtain a more optimal schedule. The constraint programming (CP) technique was used for solving this problem. Based on the proposed scheduling model and algorithm, a two-stage scheduling system for resource leveling of linear projects was developed for automatically establishing a linear schedule for resource leveling. The effectiveness of the proposed model and algorithm was verified for a highway construction project reported previously.
    publisherAmerican Society of Civil Engineers
    titleTwo-Stage Scheduling Model for Resource Leveling of Linear Projects
    typeJournal Paper
    journal volume140
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000862
    treeJournal of Construction Engineering and Management:;2014:;Volume ( 140 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian