YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Incorporation of Alternatives and Importance Levels in Scheduling Complex Construction Programs

    Source: Journal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 006
    Author:
    Yuhong Wang
    ,
    Yun Le
    ,
    Jiukun Dai
    DOI: 10.1061/(ASCE)ME.1943-5479.0000349
    Publisher: American Society of Civil Engineers
    Abstract: A complex construction program usually consists of a group of interrelated projects with different levels of importance and degrees of certainty. Currently, time management of a construction program uses the same techniques as those for a single project, and the most commonly used technique is the critical path method (CPM). However, the CPM method lacks flexibility in handling uncertainties and options, a desirable feature in managing complex programs. This paper proposes a new scheduling method that is drawn from the authors’ experiences of managing a large-scale construction program—the Shanghai Expo facility construction. The new method is developed on the basis of the traditional CPM method but is able to incorporate options and importance levels into the program schedule. The theoretical basis and calculation method of this new scheduling technique are discussed in the context of managing the Shanghai Expo facility construction program. This paper contributes to the body of knowledge in construction management by developing a new scheduling technique with proven applications.
    • Download: (1.539Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Incorporation of Alternatives and Importance Levels in Scheduling Complex Construction Programs

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/73018
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorYuhong Wang
    contributor authorYun Le
    contributor authorJiukun Dai
    date accessioned2017-05-08T22:11:02Z
    date available2017-05-08T22:11:02Z
    date copyrightNovember 2015
    date issued2015
    identifier other37478870.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/73018
    description abstractA complex construction program usually consists of a group of interrelated projects with different levels of importance and degrees of certainty. Currently, time management of a construction program uses the same techniques as those for a single project, and the most commonly used technique is the critical path method (CPM). However, the CPM method lacks flexibility in handling uncertainties and options, a desirable feature in managing complex programs. This paper proposes a new scheduling method that is drawn from the authors’ experiences of managing a large-scale construction program—the Shanghai Expo facility construction. The new method is developed on the basis of the traditional CPM method but is able to incorporate options and importance levels into the program schedule. The theoretical basis and calculation method of this new scheduling technique are discussed in the context of managing the Shanghai Expo facility construction program. This paper contributes to the body of knowledge in construction management by developing a new scheduling technique with proven applications.
    publisherAmerican Society of Civil Engineers
    titleIncorporation of Alternatives and Importance Levels in Scheduling Complex Construction Programs
    typeJournal Paper
    journal volume31
    journal issue6
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000349
    treeJournal of Management in Engineering:;2015:;Volume ( 031 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian