YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 002
    Author:
    Marion M. Russell
    ,
    Min Liu
    ,
    Gregory Howell
    ,
    Simon M. Hsiang
    DOI: 10.1061/(ASCE)CO.1943-7862.0000900
    Publisher: American Society of Civil Engineers
    Abstract: Buffers are used in construction to absorb variation caused by the inherent complexity and uncertainty present in construction projects. The case studies presented here focus on time buffer added to construction task durations. For this research, time buffer is defined as extra time added during planning to individual task durations to compensate for uncertainty and protect against workflow variation. Two case studies were conducted with one involving a mechanical contractor and the other involving a large general contractor. This research contributes to the body of knowledge by: (1) investigating the time buffer impact on project performance; (2) empirically demonstrating the effect of last planner system (LPS) on reducing time buffer and increasing percent planned complete (PPC); and (3) examining the buffer trends of different trades and activity types. The findings demonstrate LPS as an example of an effective planning strategy for construction managers in improving project performance and help them understand what drives the need for buffer in their construction schedules, allowing efforts focused on strategically addressing the most critical areas of concern and uncertainty.
    • Download: (1.429Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/72804
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMarion M. Russell
    contributor authorMin Liu
    contributor authorGregory Howell
    contributor authorSimon M. Hsiang
    date accessioned2017-05-08T22:10:23Z
    date available2017-05-08T22:10:23Z
    date copyrightFebruary 2015
    date issued2015
    identifier other37095820.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/72804
    description abstractBuffers are used in construction to absorb variation caused by the inherent complexity and uncertainty present in construction projects. The case studies presented here focus on time buffer added to construction task durations. For this research, time buffer is defined as extra time added during planning to individual task durations to compensate for uncertainty and protect against workflow variation. Two case studies were conducted with one involving a mechanical contractor and the other involving a large general contractor. This research contributes to the body of knowledge by: (1) investigating the time buffer impact on project performance; (2) empirically demonstrating the effect of last planner system (LPS) on reducing time buffer and increasing percent planned complete (PPC); and (3) examining the buffer trends of different trades and activity types. The findings demonstrate LPS as an example of an effective planning strategy for construction managers in improving project performance and help them understand what drives the need for buffer in their construction schedules, allowing efforts focused on strategically addressing the most critical areas of concern and uncertainty.
    publisherAmerican Society of Civil Engineers
    titleCase Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System
    typeJournal Paper
    journal volume141
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0000900
    treeJournal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian